BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a playground / park / athletic field in Chatham, Illinois. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

Wastewater Treatment System QUALIFICATIONS Bidders must be qualified prior to the bid deadline of June 4, 2024, in accordance with Wisconsin Statute 16.855 (9m). SPECIAL REQUIREMENT The bidder shall obtain the Dane County Sanitary Permit and the WI DNR Waster Water Permit. Prime Contractors, in awarding subcontracts, is required to make a good faith effort to achieve a minimum goal of participation by MBE's and WBE's, in accordance with Public Law 102-389. Attention to bidders is particularly called to the arrangements as to conditions of employment to be observed and minimum wage rates to be paid under contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. As required per WI. Stat.66.091(7), provide a subcontractor list (if any) along with Bid Form. The contract shall not be subject to Prevailing Wage Rates. No bidder may withdraw his/her bid within 60 days after the actual day of the opening thereof. The bidder shall include anchoring costs as an addendum, if deemed necessary. The Town of Montrose reserves the right to reject any and all bids and to waive informalities in any bid. The proposed work consists of furnishing and placing an HMA Binder course and HMA surface course over the existing prepared asphalt/concrete tennis/pickle ball courts located at the South Park site. All incidentals including existing surface preparation, tack coat and fog coat between lifts shall be included. All existing fencing (internal and perimeter) along with existing net posts shall be removed by the Village prior to construction. Any debris and or removal items necessary to perform the paving operations shall be included as part of the project, officially known as the VILLAGE OF CHATHAM, PICKLE BALL COURTS HMA OVERLAY IMPROVEMENTS- SOUTH PARK, Chatham, Illinois.

Award

Playgrounds / Parks / Athletic Fields

$137,556.00

Public - City

Paving, Site Work

4

5

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
40
Bidding Soon
741
All Active Projects
305
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

July 3, 2024

img_map_placeholder

S Park, Chatham, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.