BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2024 at 8:00 PM

Updated August 30, 2024

Site work and paving for a mixed-use development in Chatham, Illinois. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project shall consist of excavating, forming, and placing concrete sidewalks on a mechanically compacted subgrade at South Park. The PCC sidewalk shall be 388 linear feet, 4" thick, and 5' wide, and 183 linear feet, 4" thick (with thickened edge), and 7' wide. Six concrete pads with a 4" thickness shall be constructed connecting the sidewalks to the pickleball courts. The concrete pads shall have the approximate dimensions: 6.75' x 6' (SW), 6' x 6' (NW), 8' x 12' (N), 8.75' x 6' (NE), 8' x 6' (SE), and 21' x 12' (S). The 21' x 12' concrete pad shall be divided into two segments by three standard 7" high steps and shall have three 42" steel tube handrails on each side and in the center of the steps. Earthwork, seeding, and mulch restoration shall be performed as necessary. The project shall consist of excavating, forming, and placing concrete sidewalks at South Park. The PCC sidewalk shall be 305 linear feet, 4"" thick, and 5' wide, and 173 linear feet, 4"" thick (with thickened edge), 7' wide, and 6 concrete pads with a 4"" thickness shall be constructed connecting the sidewalks to the pickleball courts. The concrete pads shall have the approximate dimensions: 6.75' x 8 (SW), 6' x 8' (NW), 8' x 12' (N), 8.25' x 8' (NE), 8' x 8' (SE), and 21' x 12' (S). The 21' x 12' concrete pad shall be divided into three segments by three standard 7"" high steps and shall have three 42"" steel tube handrails on each side and center of the steps. Seeding and mulch restoration shall be performed as necessary. Questions concerning this proposal may be submitted to Dustin Patterson via email or phone: dpatterson@ chathamil.gov or 217-697-5805. (c) Unit Prices must be included in each bid. All materials furnished shall be from an Illinois Department of Transportation approved source. All work (weather pending) shall be completed by no later than September 30th, 2024. Rejection of Bids: The Owner reserves the right to waive technicalities or to reject any or all proposals. Award will not be made solely upon low bid but rather the inal selection by the Village of Chatham Board.

Award

Playgrounds / Parks / Athletic Fields

$58,819.00

Public - City

Paving, Site Work

4

5

8

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
85
Bidding Soon
1,308
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2024

September 19, 2024

Project location map

S Park, Chatham, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.