Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in St George, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Project Description: Project consists of constructing a new parking lot and reconstruction of a driveway to the parking lot. Mobilization, remove asphalt. Remove concrete flatwork. Remove curb & gutter and curb wall. Remove SD inlet boxes. Remove 8" SD pipe. Tree removal. Excavation to subgrade & haul off. Excavation of topsoil only as needed. For topsoil re-use, stockpiled, placed and compacted as topsoil. Soft spot excavation & repair. HMA (heavy duty) -3", 6" road base 18" granular borrow & geotextile fabric. 8" concrete & 8" road base. 8" colored concrete & 8" road base. 24" curb & gutter (standard, mountable & spill) & road base. 6" curb wall & road base. Double curbed gutter & road base. 4" concrete flatwork & road base. 2' concrete waterway & road base. Truncated domes. Bollards. Relocate existing fire hydrant, install water valve w/ concrete collar. 6" water line & remove or abandon existing. 8" water line & remove or abandon existing. 6" RS gate valve & remove or abandon existing. Sd inlet box with frame & grate each. 12" SD pipe L.F. connect to existing SD inlet box. Landscaping, trees & irrigation. Pavement marking paint. Electrical. Question Deadline 05/20/2024 at 3:00 PM MT
Bid Results
Roads / Highways
$827,434.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 23, 2024
June 24, 2024
160 S 800 E, St George, UT
Related To This Project
St George, UT
Bid Date: May 24 2024
St George, UT
Bid Date: Jun 20 2024
St George, UT
Bid Date: May 28 2024
St George, UT
Bid Date: May 31 2024
St George, UT
Bid Date: Jun 04 2024
St George, UT
Bid Date: Jun 03 2024
St George, UT
Bid Date: May 02 2024
St George, UT
Bid Date: Apr 18 2024
St George, UT
Bid Date: Apr 30 2024
St George, UT
Bid Date: Apr 22 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.