Published June 25, 2024 at 8:00 PM

Updated June 26, 2024

Site work and renovation of a civil project in West Orange, Texas. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

This project will provide for the complete rehabilitation of the interior and exterior surfaces of the Well Site No. 2 and Well Site No. 3 250,000 gallon elevated storage tanks and improvements to the existing water wells pumping equipment and motors at both well sites. Well Site No. 2 is located at the intersection of Austin Avenue and Jasper Street, and Well Site No. 3 is located on Williams Street in the City of West Orange, Texas. A Pre-Bid Inspection of each elevated storage tank was performed on July 14, 2022. Copies of the Pre-Bid Inspection Reports are attached. Each proposal shall be accompanied by a bid guarantee of not less than 5% of total bid amount, as a guarantee that the bidder will enter into a contract and execute the required bonds within ten days after notice of award. At the option of the bidder, the guarantee may be one of the following: a. Cashier's check or certified check upon a national or state bank, payable to Orange County Water Control & Improvement District No. 2. b. Negotiable U.S. Government bonds (at par value). c. Bid bond from a surety company listed in the latest issue of U.S. Treasury Circular 570, such bid bond being within the maximum amount specified for such company in that publication. Bids without such guarantee will not be considered. The successful bidder must furnish Performance Bond and Payment Bond on the forms provided in the amount of one hundred percent (100%) of the total contract price from a Surety or other Sureties acceptable to the Owner. Since state approval is required for award of contract, the Owner reserves the right to award the contract at any time within sixty (60) days after bid opening. Award of this contract is contingent upon funds being released by the Texas Water Development Board. Award of this contract will be made on the basis of the lowest responsive responsible bid. The right is reserved as the interest of the Owner may require, to reject any or all bids, and to waive any informality in bids received. Question Deadline 05/27/2024 at 5:00 PM CT All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Bid Results

Water / Sewer

$1,208,380.00

Public - County

Renovation, Site Work

16

8

5

7

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
43
Bidding Soon
690
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

August 5, 2024

Project location map

Multiple Locations, West Orange, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.