Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 25, 2025 at 8:00 PM
Updated September 11, 2025
Site work and new construction of an educational facility in West Orange, Texas. Completed plans call for the construction of a 98,708-square-foot educational facility; and for site work for a educational facility.
In general, the project, NORTH EARLY CHILDHOOD CENTER, includes but is not limited to: dirt work, utility work, concrete paving, concrete walks, drilled piers, concrete slabs, structural steel, steel joists, metal deck, single-ply roofing, masonry, storefront system, electrical, plumbing, and HVAC. Interior finishes include but are not limited to: steel studs and drywall, wood sports flooring, carpet tiles, ceramic tile, resilient sports flooring, paint, acoustical ceiling, millwork, casework, marker board, tack boards, projection screens, fire extinguishers and cabinets, toilet partitions, toilet accessories, plaque, identifying devices, and window blinds. Document Note: Contract Documents (full sets) may be purchased for the cost of reproduction from: A&E Reprographics 707 West Road Houston, Texas 77038 A&E Reprographics 361 Green Road Houston, TX 77060 (281) 875-2500 Proposal security in the form of a Proposal Bond (Section 00 61 00) made payable to the Owner in an amount equal to 5% of the largest possible total of the proposal will be required for all proposals. Guaranty Bonds in the form of a 100% Performance Bond and a 100% Payment Bond may be required from any subcontractor whose proposal is in excess of $100,000 at the option of the Construction Manager. Sub-Contractors shall Refer to the Construction Manager's information packet. Project Size: 98,708 SF Project Duration: >365 Days
Post-Bid
Educational
$50,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2025
October 1, 2025
2605 Martin Luther King Dr, West Orange, TX
Related To This Project
West Orange, TX
Bid Date: Sep 03 2025
West Orange, TX
Bid Date: Oct 08 2025
West Orange, TX
Bid Date: Oct 08 2025
West Orange, TX
Bid Date: Dec 17 2025
West Orange, TX
Bid Date: Sep 03 2025
West Orange, TX
Bid Date: Jun 04 2024
West Orange, TX
Bid Date: Jun 04 2024
West Orange, TX
Bid Date: May 15 2024
West Orange, TX
--
West Orange, TX
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
