Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 3, 2024 at 8:00 PM
Updated July 13, 2024
Renovation of a mixed-use development in Dover, Pennsylvania. Completed plans call for the renovation of a educational facility.
Removal and replacement of all doors which open to the exterior of the building, to include replacing all frames, hardware, and hollow metal doors - with the exception of 5 locations which have storefront-type double doors to be replaced with same - as well as rekeying. See attachment 7.2 for Door List. Boiler Replacement - Scope: Removal and/or Selective Demolition of Unit 1 boiler, including disconnection of the heating water loop and assorted small plumbing connections, as well as disconnection of electrical and gas components and connections. Replacement of boiler with new unit on comparable or smaller footprint, rated for at least 6000MBH. Reuse of existing connections to heating loop and other systems, as applicable. Removal of old defective control panel and gauge board for Unit 3. Replacement of old Unit 3 control panel and new pneumatic-electric control system. $1-5 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Educational
$5,000,000.00
Public - Federal
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 12, 2024
September 2, 2024
To Be Determined, Dover, PA
Related To This Project
Dover, PA
Bid Date: Oct 10 2024
Dover, PA
Bid Date: Oct 21 2024
Dover, PA
Bid Date: Nov 18 2024
Dover, PA
Bid Date: Dec 02 2024
Dover, PA
Bid Date: Feb 03 2025
Dover, PA
Bid Date: Feb 11 2025
Dover, PA
Bid Date: Apr 22 2025
Dover, PA
Bid Date: May 21 2025
Dover, PA
Bid Date: May 07 2024
Dover, PA
Bid Date: Apr 16 2024
Dover, PA
Bid Date: Mar 21 2024
Dover, PA
Bid Date: Mar 07 2019
Dover, PA
Bid Date: Feb 28 2022
Dover, PA
Bid Date: Mar 09 2022
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
