BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Golden, Colorado. Conceptual plans call for the construction of a 59,000-square-foot municipal facility; and for site work for a municipal facility.

Reference Number 0000352813 The City of Golden (City) invites qualified firm(s) and individuals (Professional Services Providers) interested in providing Architectural Design and Engineering (A/E) services, to submit a response to this Request for Qualifications (RFQ) for the design of the Heart of Golden Phase 1, Municipal Facility (Police Department and City Hall). All official communication with candidates and questions regarding this RFQ should be emailed to the City's Owner's Representative, Artaic Group. The site of the Project consists of the previously demolished site of the Coors North Office. This facility was demolished to ground level, with drilled piers remaining a few feet below grade as described in Exhibit F. About 20% of the drilled piers were surveyed and this survey confirmed the piers are located as expected on the prior building's gridlines. The new building (and proposed garage) structural foundation and building grid design must consider the location of the existing 36 drilled piers. The new grid must be offset sufficiently to avoid the prior grid and existing drilled piers. The proposed Municipal Facility is detailed in the following exhibits and referenced as Phase 1 of the Golden Civic Campus Program (Exhibit D). This facility is to include space to support the following functions as identified in the Golden Civic Center Program Plan (Exhibit E), totaling approximately 59,000 gross square feet with estimated hard costs of $45,000,000. Question Deadline 05/31/2024 at 5:00 PM MT Questions are submitted online No, All official communication with Candidates and questions regarding this RFQ will be via email to the Owner's Representative at the delivery address listed below. Project Director: Rob Taylor E-mail: rob.taylor@artaicgroup.com The City of Golden reserves the right to reject any statements of qualifications and to accept the statements of qualifications deemed most advantageous to the best interests of the City.

Conceptual

Municipal

$45,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
37
Bidding Soon
998
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2025

img_map_placeholder

To Be Determined, Golden, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.