Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2024 at 8:00 PM

Updated August 28, 2025

Renovation of a mixed-use development in Westford, Massachusetts. Completed plans call for the renovation of a educational facility.

Stony Brook WWTF Painting Project Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. SCOPE OF WORK A. Items of work include but are not limited to the surface preparation and coating of the following: 1. Previously painted surfaces to be recoated: a. Exterior of Aerobic RBC steel tank vessel, including steel pipe flanges, flange rails, and steel splitter box along with connecting steel pipe flanges, and check valves. b. 18 inches below water line of Aerobic RBC interior steel baffles and interior steel tank walls. c. Full Interior of steel clarifier tank vessel including internal clarifier components including but not limited to rake arms, center columns, and drive. d. Exterior of steel clarifier tank to the maximum accessible extent, including connected steel process pipes and pipe flanges. e. Steel catwalks, grate supports, and railings attached to clarifier. f. Touch up painting in areas of demolished items. g. Replacement of any painted signs/stencils on pipes or tanks covered by recoating work.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

7

13

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
815
Active Projects
370
Bidding Soon
5,554
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

July 8, 2024

Project location map

9 Farmer Way, Westford, MA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed