BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Wenatchee, Washington. Completed plans call for site work for a water / sewer project.

Trout Unlimited (TU, Sponsor) for construction of the Lower Wenatchee Instream Flow Enhancement Project Phase II. Work to be performed includes removal of the existing pump station and building, pipeline, ditch system, obstructions, and appurtenances; construction of a new 11' by 18' pump station building, pump system including (3) 125 hp vertical turbine driven pumps and (1) 40 hp vertical turbine pump; installation of approximately 14,700 feet of HDPE irrigation main pipe ranging from 24 inch to 4 inch diameter; appurtenances, corrugated metal culvert pipe, and restoration. Pumps will be operated by a pressure driven variable frequency drive motor control system. Direct questions regarding the contract documents to Dan Jaspers, Trout Unlimited, djaspers@tu.org [djaspers@tu.org], (509) 669-0028. Trout Unlimited reserves the right to reject any or all bids and to waive irregularities in the bid or the bidding. TU hereby notifies all bidders that it will affirmatively ensure that in any contract entered into, pursuant to this advertisement, minority and women's business enterprises will be afforded full opportunity to submit bids in response to the invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. Trout Unlimited is an equal opportunity and affirmative action employer. All work performed on the project will be subject to state or federal prevailing wage rates, whichever is higher. Each bid proposal shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, postal money order, or surety bond in an amount equal to at least 5 percent of the amount of such bid proposal. Make checks payable to Trout Unlimited. Should the successful bidder fail to enter into such contract and furnish satisfactory performance and payment bond within the time stated in the Specifications, the bid proposal deposit shall be forfeited to the Trout Unlimited. Project Engineers Estimate: $3.8 Million Last Day for Questions: June 12, 2024

Award

Water / Sewer

$3,632,925.00

Public - State/Provincial

Site Work

86

8

23

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
3
Bidding Soon
94
All Active Projects
27
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

October 15, 2024

img_map_placeholder

Multiple Locations, Wenatchee, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.