Published June 22, 2024 at 8:00 PM

Updated October 1, 2024

Demolition, site work and paving for a mixed-use development in Sunbury, Pennsylvania. Completed plans call for the demolition of a sidewalk / parking lot; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The project consists of the following: Installing accessible trails along the City's wetland park, installing an ADA handicap parking area along 8th Street, installing a new pavilion with ADA restrooms, an overlook and installing new ADA curb ramps along the project area. Project includes demolition, excavation, utilities, cast-in-place concrete, masonry, miscellaneous steel, aluminum railing, rough carpentry, pre-engineered wood trusses, metal roofing, viny soffit, hollow metal doors and frames, door hardware, aluminum windows, painting, toilet accessories, ADA curb ramps, paving patch, gravel pathways, seeding and mulching, etc. Question Deadline 05/23/2024 at 4:00 PM ET Bidder shall submit all questions about the meaning or intent of the Bidding Documents via online to the date for receipt of bids or by email to skeck@ces-engr.com. A certified check or bank draft payable to the order of The City of Sunbury, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the total of the Bid, shall be submitted with each bid. The Bidder shall include the fully completed Non-Collusion Affidavit with the bid. A Performance and Payment Bond in an amount equal to 100% of the amount of the contract and a Warranty Bond for 10% of the amount of the contract issued by a corporate surety authorized to do business in the Commonwealth of Pennsylvania will be required to be furnished by the successful bidder. Bids may be held by the City for up to 60 days from the date of opening for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding the contract. The City reserves the right to reject any or all bids, to waive any irregularities, or to negotiate contract amounts.

Bid Results

Sidewalks / Parking Lot

$332,500.00

Public - City

Demolition, Paving, Site Work

21

25

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Flashing and Sheet Metal, Sheet Metal Roofing, Sheet Metal Flashing and Trim, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 26 - Electrical

Division 26 - Electrical

Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
73
Bidding Soon
1,022
All Active Projects
438
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2024

July 1, 2024

img_map_placeholder

Multiple Locations, Sunbury, PA

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

SWEEP Phase II Trail Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.