BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Jackson, Mississippi. Working plans call for site work for a transportation facility; and for paving for a transportation facility.

construction and related services for the Apron Expansion project (the "Work") at Jackson-Medgar Wiley Evers International Airport. This project is anticipated to receive a Bi-Partisan Infrastructure Law (BIL) grant from the Federal Aviation Administration (FAA). The selected firm must be familiar with the process and required documentation associated with the FAA's grant process. This includes, but is not limited to, FAA grant assurances, FAA airport design standards, 14 Code of Federal Regulations (CFR) Part 77 airspace requirements, as well as familiarization with applicable FAA Orders, Advisory Circulars (AC), and Interim Guidance Project Background The apron space at Gate 16 and at Gate 18 will be expanded to accommodate the two passenger boarding bridges, and to accommodate larger aircraft that could potentially utilize the two gates. The current apron allows enough wing clearance for smaller regional jet aircraft, but it is too confined to allow safe movements of larger aircraft, such as the Boeing 737 or the Airbus 320, both currently flown by multiple carriers. Expanding the apron area will ensure that both gates are able to handle varied sizes of aircraft and will allow the JMAA to maximize the revenue potential from both gate areas. Scope of Work The project consists, but is not limited to the expansion of the existing terminal apron with a new concrete pavement section, removal of a portion of the existing west employee parking lot, removal of parking lot lighting, removal of drainage structures, relocating a portion of perimeter fence, earthwork, sidewalk construction, parking lot marking removal and installation, and handicap sign installation. Question Deadline 06/04/2024 Award of contract will be based on the lowest bid submitted from those bidders that are confirmed as being responsive and responsible. Only those Bids timely received, in proper form and meeting all qualifications will be considered. Upon receipt, each Proposal will be reviewed for conformance to the RFB instructions regarding organization, format, and required content. Proposals that are missing information such that a full evaluation cannot occur will be deemed nonresponsive and ineligible for further consideration.

Final Planning

Transportation Terminals

$300,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
11
Bidding Soon
225
All Active Projects
98
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2024

July 22, 2024

img_map_placeholder

100 International Dr, Jackson, MS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.