BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2024 at 8:00 PM

Updated June 7, 2024

Site work for a water / sewer project in North Hartland, Vermont. Completed plans call for site work for a water / sewer project.

W912WJ24Q0111, W13G8641006112 Dam Access Road Repairs, North Hartland Lake, North Hartland, VT. Questions regarding the solicitation shall be directed to the Contract Specialist: a. Name: Ann Murphy Adley b. Phone: 978-318-8255 c. Email: Ann.M.Adley@usace.army.mil Scope - Furnish all labor, materials, and equipment necessary to perform the following work: a. Remove approximately sixty (60) cubic yards of silt from twelve hundred feet (1200') from the dam access road and add one hundred twenty (120) cubic yards of gravel along the 0.5-mile road. b. Grade dam access road. c. Clean ditches along dam access road d. All material will be removed offsite. Area was damaged during the December 2023 flooding. See Part II, Technical Requirements for more information. NOTE: Part of the road is along the base of the dam and goes around the concrete gatehouse 2. Location - The North Hartland Lake Project office is located at 112 Clay Hill Road, North Hartland, Vermont 05052. MAGNITUDE OF PROJECT The estimated cost of the work is less than $25,000.

Award

Water / Sewer

$11,980.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2024

June 27, 2024

Project location map

112 Clay Hill Rd, North Hartland, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.