Site work and paving for a sidewalk / parking lot in Westbrook, Maine. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Project consists of the renovation and paving of approximately 7,488 SYof Organizational andNonOrganizational parking at the Westbrook Armory located at 120 Stroudwater Street, Westbrook,Maine. This includes approximately 847 SYof 8" thick concrete pavement with an Alternate Bid Item expanding the 8" concrete pavement to a total of 3,099 SY. Project requirements also include the removal of approximately 7660 CYof existing gravel parking; emplacement of 223 SYof concrete pads and aprons, 226 LF ofconcrete curb; the demolition of the abandoned metal storage building (1,800 sf) and slab, the replacement ofexistingfencing and gates, installation of stomwater drainage and exterior lighting. Project will be executed in two phases with the earthwork phase completed no later than 1 October 2024 and the paving phase no later than 31 July 2025. All work to be executed in accordance with plans and specifications developed by Colby CompanyEngineering, dated 24 May 2024. The Department of Defense, Veterans and Emergency Management is conducting a competitive bid process for the Westbrook Armory MOV/POV Compound Project in Westbrook, Maine. Project consists of the renovation and paving of approximately 7,488 SY of Organizational and Non-Organizational parking at the Westbrook Armory located at 120 Stroud water Street, Westbrook, Maine. This includes approximately 847 SY of 8" thick concrete pavement with an Alternate Bid Item expanding the 8" concrete pavement to a total of 3,099 SY. Project requirements also include the removal of approximately 7,660 CY of existing gravel parking; emplacement of 223 SY of concrete pads and aprons, 226 LF of concrete curb; the demolition of the abandoned metal storage building (1,800 sf) and slab, the replacement of existing fencing and gates, installation of storm water drainage and exterior lighting. Project will be executed in two phases with the earthwork phase completed no later than 1 October 2024 and the paving phase no later than 31 July 2025.
Award
Sidewalks / Parking Lot
$809,311.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 13, 2024
July 15, 2024
120 Stroudwater St, Westbrook, ME
Related To This Project
Westbrook, ME
--
Westbrook, ME
--
Westbrook, ME
--
Westbrook, ME
--
Westbrook, ME
Bid Date: Sep 12 2024
Westbrook, ME
--
Westbrook, ME
--
Westbrook, ME
Bid Date: May 23 2024
Westbrook, ME
--
Westbrook, ME
Bid Date: Mar 12 2024
Westbrook, ME
Bid Date: Mar 27 2024
Westbrook, ME
Bid Date: Feb 29 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.