Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a civil project in Stillwater, Oklahoma. Completed plans call for the renovation of a water / sewer project.
Furnish and Install Electromagnetic Flow Meter Systems Question Deadline 06/05/2024 at 5:00 PM CT Any questions regarding this Notice or the proposal documents should be directed to John McClenny 405.742.8233 or john.mcclenny@stillwater.org. Scope of Work 1. Furnish and install three (3) inline twenty-four (24) inch electromagnetic flow meter systems as described in these specifications and in accordance with the manufacturer's recommendations for all locations. Include any spool pieces or gaskets necessary to mount the new flow meter(s) and new flange gasket kits with new hardware. a. Two (2) meters will be installed at the Stillwater Water Treatment Plant, 1022 W Yost Road, Stillwater, OK. b. One (1) meter will be installed at the Kaw Lake Pump Station, 9430 E. South Ave, Ponca City, OK. 2. Provide all necessary equipment and labor to remove three existing 24" mag meters, including but not limited to safety equipment, A-frame hoist and/or crane, etc. 3. SUA equipment and personnel are not available to assist with removal and installation. 4. Coordinate with plant staff prior to removing any of the three existing mag meters. 5. No valves are to be operated by the contractor without prior approval of water treatment plant staff. 6. The SUA will work with the Contractor to determine the optimal time of year to complete the work. Each meter installation shall have a specific shut-down time, dependent upon time of year and plant demands. Shut down times will be between 4 and 6 hours maximum. 7. All three meters shall be delivered to the water plant/contractors' shop prior to the start of any removal or installation work
Award
Water / Sewer
$43,770.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2024
July 12, 2024
Multiple Locations, Stillwater, OK
Related To This Project
Stillwater, OK
Bid Date: Jun 26 2024
Stillwater, OK
Bid Date: Jul 01 2024
Stillwater, OK
Bid Date: Dec 04 2024
Stillwater, OK
Bid Date: Oct 01 2024
Stillwater, OK
Bid Date: Jul 08 2024
Stillwater, OK
Bid Date: Jul 03 2024
Stillwater, OK
Bid Date: Jul 24 2024
Stillwater, OK
Bid Date: Jul 30 2024
Stillwater, OK
Bid Date: Jun 26 2024
Stillwater, OK
Bid Date: May 29 2024
Stillwater, OK
Bid Date: Jun 10 2024
Stillwater, OK
Bid Date: Jun 05 2024
Stillwater, OK
Bid Date: May 29 2024
Stillwater, OK
Bid Date: Jun 12 2024
Stillwater, OK
Bid Date: Jun 13 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.