Demolition, site work, paving and new construction of a bridge / tunnel in Struthers, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project consists of the replacement of the Wetmore Drive Bridge over Yellow Creek, an existing 42' long, single-span, concrete tee-beam bridge on full-height abutments on spread footings in the City of Struthers. The work also includes partial replacement of a culvert on the west approach. The bid bond may be in the form of a bid guarantee, letter of credit for 100% of the project, or certified check from a solvent bank or cash in the amount of 10% of the total bid submitted. Bid security furnished in Bond form shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide such surety. Checks should be made payable to the City of Struthers. Bid guarantees/bid bonds will be returned to all unsuccessful bidders Engineer's Estimate: $1,235,887.90 The owner intends and requires this project to be completed no later 150 days after the Wetmore Drive road closure. All questions concerning the project should be directed to Damon Fulk at Environmental Design Group, dfulk@envdesigngroup.com. The City of Struthers (Owner) reserves the right to reject any and all bids, to waive any and all informalities and the right to disregard all non-conforming, non-responsive, unbalanced or conditional bids. Also, the owner reserves the right to reject the bids of any bidder if the owner believes it would not be in the best interest of the owner to make the award of that bid; whether because the bid is not responsive, or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standards or criteria established by the owner. No Bidder may withdraw his/her bid within ninety (90) days after the actual date of the bid opening. The successful bidder shall furnish steel and iron products that are made in the United States according to the applicable provisions of Federal regulations stated in 23 CFR 634.410 and State of Ohio laws, ORC 153.011 and 5525.21. Attention of Bidders is particularly called to the requirements and condition of construction to be observed and minimum wage rates paid under this contract. Successful Bidders will be required to pay at least minimum wage rates predetermined by the Federal Davis Bacon Wage Rates for the project as required. The schedule of approved Federal Davis Bacon Wage Rates are incorporated in the Contract Documents. Bond must be executed on the forms provided in the bidding and contract documents. Standard bonding documents will not be acceptable. DBE Goal for this project is 10% BIDDERS are encouraged to use women, minority business enterprises and disadvantaged business enterprises whenever possible. All bidders shall submit a DBE Utilization Plan before the time of bid opening to the online. The apparent low bidder MUST complete all the requirements set forth within the DBE Affirmation within five days of the Bid Opening date. A Bidder must be prequalified by ODOT according to ORC Chapter 5525 and the rules and regulations governing prequalification in order to submit a Bid.

Award

Bridges / Tunnels

$998,085.00

Public - City

Demolition, New Construction, Paving, Site Work

32

9

47

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
61
Bidding Soon
1,150
All Active Projects
451
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

August 19, 2024

img_map_placeholder

Wetmore Dr, Struthers, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.