BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 22, 2025 at 8:00 PM

Updated May 23, 2025

Renovation of a water / sewer project in Milwaukee, Wisconsin. Conceptual plans call for the renovation of a water / sewer project.

Update: The purpose of this project is to ensure the District maintains operations of biosolids processing at the Dewatering & Drying facility as this process is critical in supporting permit compliance, providing Milorganite revenue, and maintaining efficient operations. The project will replace or upgrade heating, ventilation, and air conditioning (HVAC) systems to ensure they efficiently heat, condition, and ventilate the areas they serve in the Dewatering & Drying Facility. HVAC systems are required to maintain Dewatering & Drying operations since failure can result in overheating of electrical equipment and reduced ventilation, both of which can lead to shutdowns of Dewatering & Drying processes. The project will also address NFPA 820 upgrades in the Dewatering & Drying Facility to improve safety and incorporate HVAC improvements to improve energy efficiency. The impacts of inflation are driving up costs. Project is included Milwaukee Metropolitan Sewerage District Fiscal Year 2024-2034 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The purpose of this project is to ensure the District maintains operations of biosolids processing at the D&D facility as this process is critical in supporting permit compliance, providing Milorganite revenue, and maintaining efficient operations. The project will replace or upgrade heating, ventilation, and air conditioning (HVAC) systems to ensure they efficiently heat, condition, and ventilate the areas they serve in the D&D Facility. HVAC systems are required to maintain D&D operations since failure can result in overheating of electrical equipment and reduced ventilation, both of which can lead to shutdowns of D&D processes. The project will also address NFPA 820 upgrades in the D&D Facility to improve safety and incorporate HVAC improvements to improve energy efficiency. The project is include in the county 2024 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$14,595,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
402
Active Projects
227
Bidding Soon
2,231
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

700 E Jones St, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.