Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 22, 2025 at 8:00 PM
Updated May 23, 2025
Renovation of a water / sewer project in Milwaukee, Wisconsin. Conceptual plans call for the renovation of a water / sewer project.
Update: The purpose of this project is to increase anaerobic digestion capacity at SSWRF to increase digester gas production to help meet the District's energy and greenhouse gas (GHG) reduction goals from the 2035 Vision. Expanding the capacity of the digesters will mitigate risk associated with inadequate capacity, increase the ability to produce more renewable energy as digester gas, and reduce energy use by reducing the digested sludge mass. The scope of this project includes the design and construction of two new processes for SSWRF, gravity thickening, and acid phase digestion. This is a Biosolids Advanced Facilities Plan recommended project. The existing anaerobic digestion process is experiencing operational issues related to the lack of digestion capacity. Primary sludge mass is expected to increase after the South Shore primary treatment project (S01013) is constructed. Primary sludge will also increase if future loadings increase. Adding primary sludge thickening and acid phase digestion will mitigate risk associated with inadequate capacity, increase the ability to produce more renewable energy as digester gas, and reduce energy use by reducing the digested sludge mass. This project is anticipated to reduce operating costs with the reduction in energy use. Project is included Milwaukee Metropolitan Sewerage District Fiscal Year 2024-2034 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The purpose of this project is to increase anaerobic digestion capacity at SSWRF. Expanding the capacity of the digesters will mitigate risk associated with inadequate capacity, increase the ability to produce more renewable energy as digester gas, and reduce energy use by reducing the digested sludge mass. The scope of this project includes the design and construction of two new processes for SSWRF, gravity thickening, and acid phase digestion. This is a Biosolids Advanced Facilities Plan recommended project. The existing anaerobic digestion process is experiencing operational issues related to the lack of digestion capacity. Primary sludge mass is expected to increase after the South Shore primary treatment project (S01013) is constructed. Primary sludge will also increase if future loadings increase. Gravity thickening Jones Island and South Shore primary sludge, combined with a two-phase anaerobic digestion system, consisting of acid phase digesters followed by the existing conventional mesophilic digesters, will increase the digestion capacity and performance. This project will increase production of renewable energy and reduce the rate of energy used to process biosolids, providing the District the opportunity to meet the 2035 Vision. This project is anticipated to reduce operating costs with the reduction in energy use. The project is include in the county 2024 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$22,000,281.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2027
To Be Determined, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: May 28 2024
Milwaukee, WI
Bid Date: Jun 17 2024
Milwaukee, WI
--
Milwaukee, WI
Bid Date: May 31 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
