BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 22, 2025 at 8:00 PM

Updated May 23, 2025

Renovation of a water / sewer project in Milwaukee, Wisconsin. Conceptual plans call for the renovation of a water / sewer project.

Update: The purpose of this project is to increase anaerobic digestion capacity at SSWRF to increase digester gas production to help meet the District's energy and greenhouse gas (GHG) reduction goals from the 2035 Vision. Expanding the capacity of the digesters will mitigate risk associated with inadequate capacity, increase the ability to produce more renewable energy as digester gas, and reduce energy use by reducing the digested sludge mass. The scope of this project includes the design and construction of two new processes for SSWRF, gravity thickening, and acid phase digestion. This is a Biosolids Advanced Facilities Plan recommended project. The existing anaerobic digestion process is experiencing operational issues related to the lack of digestion capacity. Primary sludge mass is expected to increase after the South Shore primary treatment project (S01013) is constructed. Primary sludge will also increase if future loadings increase. Adding primary sludge thickening and acid phase digestion will mitigate risk associated with inadequate capacity, increase the ability to produce more renewable energy as digester gas, and reduce energy use by reducing the digested sludge mass. This project is anticipated to reduce operating costs with the reduction in energy use. Project is included Milwaukee Metropolitan Sewerage District Fiscal Year 2024-2034 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The purpose of this project is to increase anaerobic digestion capacity at SSWRF. Expanding the capacity of the digesters will mitigate risk associated with inadequate capacity, increase the ability to produce more renewable energy as digester gas, and reduce energy use by reducing the digested sludge mass. The scope of this project includes the design and construction of two new processes for SSWRF, gravity thickening, and acid phase digestion. This is a Biosolids Advanced Facilities Plan recommended project. The existing anaerobic digestion process is experiencing operational issues related to the lack of digestion capacity. Primary sludge mass is expected to increase after the South Shore primary treatment project (S01013) is constructed. Primary sludge will also increase if future loadings increase. Gravity thickening Jones Island and South Shore primary sludge, combined with a two-phase anaerobic digestion system, consisting of acid phase digesters followed by the existing conventional mesophilic digesters, will increase the digestion capacity and performance. This project will increase production of renewable energy and reduce the rate of energy used to process biosolids, providing the District the opportunity to meet the 2035 Vision. This project is anticipated to reduce operating costs with the reduction in energy use. The project is include in the county 2024 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$22,000,281.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
355
Active Projects
194
Bidding Soon
1,939
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

To Be Determined, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.