Published May 22, 2025 at 8:00 PM

Updated May 23, 2025

Site work for a water / sewer project in Milwaukee, Wisconsin. Conceptual plans call for site work for a water / sewer project.

Update: The purpose of this project is to design and construct a reliable, sustainable, cost-effective disinfection process relative to the new E.coli WPDES limits effective in 2024. Initial evaluations have determined that current disinfection methods (sodium hypochlorite), may not be a cost-effective or reliable method to meet the new E.coli limit. Design and construction of a new system is anticipated to provide that reliability while reducing the overall cost of treatment. The project scope includes the design and construction of a new disinfection process at SS. For the purposes of this project, it was assumed to be a UV disinfection system for flows up to 150 MGD, and sodium hypochlorite for flows above 150 MGD to be consistent with Alternate 3 from the 2050 Facilities Plan. The improvements are anticipated to reduce the cost of treatment, therefore reducing the costs to the operating budget. Project costs are increased for inflation and consultant engineering expenses. Project is included Milwaukee Metropolitan Sewerage District Fiscal Year 2024-2034 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The purpose of this project is to design and construct a reliable, sustainable, cost-effective disinfection process relative to the new E.coli WPDES limits effective in 2024. Initial evaluations have determined that current disinfection methods (sodium hypochlorite), may not be a cost-effective or reliable method to meet the new E.coli limit. Design and construction of a new system is anticipated to provide that reliability while reducing the overall cost of treatment. The project scope includes the design and construction of a new disinfection process at SS. For the purposes of this project, it was assumed to be a UV disinfection system for flows up to 150 MGD, and sodium hypochlorite for flows above 150 MGD to be consistent with Alternate 3 from the 2050 FP. The improvements are anticipated to reduce the cost of treatment therefore reducing the costs to the operating budget. The project is include in the county 2024 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$28,951,721.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
294
Active Projects
169
Bidding Soon
1,975
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

To Be Determined, Milwaukee, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.