BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 25, 2024 at 8:00 PM

Updated July 26, 2024

Renovation of a municipal facility in Lakewood, Colorado. Completed plans call for the renovation of a municipal facility.

Replace Exterior Caulk and Windows - 1881 Pierce Phase 1 Estimated Construction Cost: $180,637.45 The building at 1881 Pierce St is comprised of two adjoining buildings, this Project is to remove and replace caulk over the entire exterior of both buildings The building is clad with pre-cast concrete panels. The caulk used to seal the gaps between panels is starting to fail allowing storm water to penetrate the façade. The existing caulk needs to be removed and replaced around the perimeter of the building provide provided product specifications. Date Email Questions Due May 20, 2024 5 pm MST Anticipated Construction Start/Finish September 30, 2024

Bid Results

Municipal

$155,244.00

Public - State/Provincial

Renovation

9

5

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
56
Bidding Soon
1,323
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.