Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Kingston, Massachusetts. Completed plans call for the renovation of a educational facility.
Electrical Work Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The work is estimated to cost $1,400,000.00. The Project consists of but not limited to: replacement of the existing coils in the classroom unit ventilators with custom coils for air conditioning. Work also includes new rooftop condensers and line sets. Alternates will consist of the replacement of the two existing gymnasium rooftop units. All bidding Requests for Information (RFIs) shall be submitted online by 06/07/2024 at 2:00PM EDT for filed sub-bids The Work consists of the Silver Lake Regional Middle School Air Conditioning Upgrades, 256 Pembroke Street, Kingston, MA 02364 as more specifically described in the attached Contract Documents, dated May 22, 2024 provided by Habeeb & Associates Architects. The Contractor shall provide all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all Work required for the completion of each item of the Work and as herein specified. The Work to be done and paid for under any item shall not be limited to the exact extent mentioned or described but shall include all incidental work necessary or customarily done for the completion of that item. SCOPE OF WORK A. Furnish all labor, supervision, permits, certificates, materials, equipment, apparatus, accessories, supplies, tools, transportation, and services necessary for and incidental to, all electrical work as shown on the Drawings and/or specified hereinafter to the full completion of installation and operation of the intended electrical system. B. The principal items of work are as follows; B1: Items to be purchased and installed 1. Grounding 2. Power and lighting distribution panels 3. Arc Flash/Coordination Study 4. Safety switches 5. Feeders to panels, load centers and equipment 6. Wiring Devices 7. Branch circuit wiring 8. Outlet boxes, receptacles, etc. 9. Fire Stopping 10. All wiring connections to plumbing/electric water heater, heating & ventilating equipment, wherever required and as indicated on Drawings 11. All other systems, equipment and work hereinafter specified and/or shown on the Contract Drawings. B2 Items to be installed ONLY: Install the following items as furnished by the designated sections: Section 230000 (HVAC): HVAC power connections to new equipment. C. It is the intent of the Specifications and the accompanying Drawings that the systems shall be furnished and installed complete. The Electrical Contractor shall furnish and install all conduit, wire, boxes, equipment, devices, and controls needed and usually furnished in connection with such work, whether specifically mentioned or not. D. The plans and specifications are complimentary to one another, and should the contractor discover a conflict between the plans and specifications or within the plans themselves the worst-case scenario shall prevail until the engineer and/or the architect provides direction. E. This Contractor shall refer to the Architectural, Civil, Landscape, Structural, Plumbing, Mechanical, Fire Protection Drawings and all other Drawings associated with the project, prior to the installation or roughing of the electrical outlets, conduit, and equipment to determine the exact location of all devices and equipment. "The Work to be performed under this Contract shall commence on August 30, 2024." "The Contractor shall achieve Substantial Completion of the entire Work on or before October 30, 2024 "Liquidated Damages": The General Contractor agrees to pay the Owner for any delay in the Work that is not warranted, the sum of one thousand dollars ($1,000) per day for every calendar day beyond the above established date of completion, said amounts to be deemed payment for liquidated and ascertained damages for such delay."
Bid Results
Educational
$108,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 13, 2024
August 30, 2024
256 Pembroke St, Kingston, MA
Related To This Project
Kingston, MA
Bid Date: Jun 21 2024
Kingston, MA
Bid Date: Jun 13 2024
Kingston, MA
Bid Date: Aug 07 2024
Kingston, MA
Bid Date: Aug 16 2024
Kingston, MA
Bid Date: Aug 16 2024
Kingston, MA
Bid Date: Aug 22 2024
Kingston, MA
Bid Date: Sep 19 2024
Kingston, MA
Bid Date: May 02 2024
Kingston, MA
Bid Date: May 01 2024
Kingston, MA
Bid Date: May 07 2024
Kingston, MA
Bid Date: Apr 11 2024
Kingston, MA
Bid Date: Jan 24 2024
Kingston, MA
Bid Date: Oct 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.