BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 25, 2024 at 8:00 PM

Updated June 26, 2024

Site work, paving and outdoor lighting for a mixed-use development in Shawnee, Oklahoma. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

In November 2014 voters approved a pavement sales tax of three-eighths of one percent (3/8) with a portion of the tax dedicated to upgrading and improving older streets with curbs, sidewalks, drainage, lighting. A citizen task force was put together to rank streets based on 7 distinct criteria. So far 2 projects have been completed (Flint Street - Johnson to 62nd Terrace and 60th Street - Flint to Nieman) with a third in construction (Goddard Street - 55th to Johnson Drive). The eligible streets are re-evaluated periodically. This segment of W 69th Street is a flat, narrow ditch section street lacking sidewalk, street lighting, and proper drainage facilities. The improvements involve complete removal and replacement of the existing street to include grading, widening, curb, sidewalk/ADA ramps, storm drainage facilities, pavement markings, and LED streetlight luminaires. The Capital Improvement Plan (CIP) for FY 2025-2029 was heard for the last time before being approved by the Board of Shawnee City Commission at a meeting held on Monday, June 17. Many projects that have been on citizens’ minds were addressed in the plan, and they are now on a timeline. The largest budgeted projects are set to begin under the FY 2025 budget. As of June 25, 2024, project is funded for construction starting January 1, 2025 and completed December 31, 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,125,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
67
Bidding Soon
1,133
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2025

Project location map

W 69th St, Shawnee, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.