Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a bridge / tunnel in Loudon, Tennessee. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Loudon County Project No. 53I075-M3-005 (PIN 114242.01) The repair of the bridge on I-75 over the Tennessee River (L.M. 7.55). Project Length - 0.000 miles Completion Time - On or before 12/15/2024 (See Special Provision 108B) Each bid must be accompanied by an electronic bid bond or a Cashier's or Certified Check made payable to the Department of Transportation, or Irrevocable Letter of Credit naming the Department as beneficiary (for Mowing and Litter projects only), in an amount equaling not less than five percent (5%) of the amount bid. All questions related to the Proposal Contract, Plans, Specifications or Special Provisions shall be directed to the Headquarters Construction Office (615-741-2414). Information received from other offices of the Tennessee Department of Transportation is strictly advisory. A Prime Contractor must prequalify with The Department of Transportation in accordance with Tennessee Code Annotated 54-5-117 and Tennessee Department of Transportation Rule 1680-5-3, Prequalification of Contractors, before bid authorization for highway contracts will be furnished. Prime contractors, except mowing and litter removal contractors, are required to be licensed with the State of Tennessee, Department of Commerce and Insurance (TDCI), Board for Licensing Contractors (BLC). Prime contractors must be licensed in the general classification (e.g. Heavy Construction (HC), Highway, Railroad, Airport Construction (HRA), Specialty (S), Municipal and Utility Construction (MU), or Electrical Contracting (CE)) for the type of work in the project which they will perform. Bidders may submit a Proposal without having a license and will be considered for award for twenty-one (21) days after Proposals are opened. If the Bidder does not have a license with the TDCI, on or before twenty one (21) days after Proposals are opened, the Bidder will be considered non-responsive and their Proposal will be rejected. The Department encourages the use of disadvantaged business enterprises on all contracts TNDOT - 020 - Repair of the Bridge on I-75 This work consists of the conditions that apply to all construction activities on the project pursuant to the following: 1. Section 404 of the Federal Clean Water Act (33 U.S.C. §1344), and all implementing regulations, including without limitation regulations of the U.S. Army Corps of Engineers governing permits for discharges of dredged or fill material into waters of the United States in 33 CFR Part 323; and 2. The Tennessee Water Quality Control Act (T.C.A. §69-3-101, et seq.) and all implementing regulations, including without limitation the Rules of the Tennessee Department of Environment and Conservation governing NPDES permits in Chapter 400 40-10, and Aquatic Resource Alteration permits in Chapter 400-40-7; and 3. Section 26a ofthe TVA Act of 1933 as amended (49 Stat. 1079, 16 U. S. C. sec. 83 ly1.) and all implementing regulations, including without limitation the regulations of the Tennessee Valley Authority governing construction in the Tennessee River System in 18 C.F.R., Part 1304; and 4. The Tennessee Wildlife Resources Agency Reel foot Lake Watershed Management permit program (T.C.A. section 70-5-1,), and all implementing regulations, including without limitation regulations authorizing any activity, practice, or project which has or is likely to have the effect of diverting surface or subsurface water from the Lake or have the effect of draining or otherwise removing water from Reel foot Lake; and 5. Coast Guard Bridge Permit (USCG) (Section 9 of the Rivers and Harbors Appropriation Act of 1899) and all implementing regulations, including but not without limitation for projects which impact streams deemed navigable by the U.S. Coast Guard. Description This work consists of providing a Portable Queue Warning System that shall be utilized to provide protection of traffic queues caused by construction operations. The system shall consist of portable radar sensors, a portable changeable message sign (PCMS), and appropriate software that will monitor and control its operation. The deployment of the system shall clearly alert motorists to slowed or stopped traffic ahead and be capable of indicating varying distance to the slowed or stopped condition. of speed differentials ahead. Maintain and update the system as required throughout the duration of the project. Please contact the Secretary of State should you have any questions at (615) 741-2286 or visit www.sos.tn.gov/business-services.
Award
Bridges / Tunnels
$299,385.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 21, 2024
August 20, 2024
I-75, Loudon, TN
Related To This Project
Loudon, TN
Bid Date: May 30 2024
Loudon, TN
--
Loudon, TN
Bid Date: Jul 31 2024
Loudon, TN
Bid Date: Sep 10 2024
Loudon, TN
--
Loudon, TN
Bid Date: Mar 19 2024
Loudon, TN
Bid Date: Apr 11 2024
Loudon, TN
Bid Date: Feb 29 2024
Loudon, TN
--
Loudon, TN
Bid Date: Feb 28 2024
Loudon, TN
Bid Date: Mar 03 2022
Loudon, TN
Bid Date: Jun 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.