BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Moreno Valley, California. Completed plans call for the renovation of a playground / park / athletic field.

The Contractorshall furnish, to the satisfaction of the Engineer, all labor, materials, tools, equipment, and incidentals, unless otherwise specified, to construct and complete the Work in compliance with the Contract Documents. The work to be done consists of furnishing all labor, materials, delivery services, necessary tools and machinery, supervision and coordination, required for the rehabilitation of Park Restrooms, lighting, plumbing and related facilities as included in the Exhibits, Specifications, and listed in the Bid Schedule. The City of Moreno Valley, ("City") invites and will receive sealed Bids for the furnishing of all labor, equipment, materials, tools, services, transportation, permits, utilities, and all other items necessary for Park Restroom Rehabilitation. The work to be done consists of furnishing all labor, materials, delivery services, necessary tools and machinery, supervision and coordination, required for the rehabilitation of Park Restrooms, lighting, plumbing and related facilities as included in the Exhibits, Specifications, and listed in the Bid Schedule. Question Submission Deadline:June 13, 2024, 2:00pm All questions regarding this solicitation must be submitted through Electronically. Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the City, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to the City of Moreno Valley to guarantee the Bidder will enter into a Contract with the City. The Contractor shall complete all preconstruction requirements, ordering of materials, and construction of the Project within the Contract Time of 30 Working Days for the Base Bid only, and up to N/A Working Days for Base Bid plus all Additive Alternate Bids after the date of commencement specified in the Notice to Proceed to Fulfill Preconstruction Requirements issued by the City. See the Agreement for details regarding the initial Notice to Proceed to Fulfill Preconstruction Requirements and Notice to Proceed with Order of Materials and subsequent Notice to Proceed with Construction. If there are no additive alternate bids then remove "Base Bid". Bid Value: $150,000 The City reserves the right, in its sole discretion, to: judge the Bidder's representations as stated in the Bid forms, including the Contractor's Statement, and any post-Bid information to determine whether or not Bidder is qualified to perform the Work; be the sole judge regarding the suitability of the products, services or supplies offered; to not purchase all items or the full quantity of each item listed in the Contract documents; accept or reject any or all Bids; modify, cancel or withdraw the Notice Inviting Bids; issue a new Notice Inviting Bids; suspend or abandon the Project; appoint evaluation committees to review bids; and seek the assistance of outside technical experts in Bid evaluation; waive deficiencies, informalities and minor irregularities in any Bid or in the bidding process; require a Bidder to provide a guarantee (or guarantees) of the Contract by a third party; and/or not issue a Notice to Proceed after execution of the Contract. In submitting a Bid in response to the Notice Inviting Bids, the Bidder is specifically acknowledging the City holds these rights. The Notice Inviting Bids does not commit the City to enter into a Contract, to reject, in its sole discretion, all Bids, nor does it obligate the City to pay for any costs incurred in preparation and submission of a Bid or in anticipation of a contract. By submitting a Bid, the Bidder disclaims any right to be paid for such costs. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. The City shall award the contract for the Project to the lowest responsive, responsible Bidder as determined by the City from the Base Bid alone. The City reserves the right to reject any or all Bids or to waive any irregularities or informalities in any Bids or in the bidding process. The City is committed to inclusion and diversity and welcomes Bids from contractors of all faiths, creeds, ancestries, and ethnicities without regard to disability, gender identity, sexual orientation, or immigration status. The City condemns and will not tolerate prejudice, racism, bigotry, hatred, bullying, or violence towards any group within or outside of our community. Location 1 : : El Potrero Park Restroom (West) Estate Design and Construction Inc - $38,660.00 Location 2: El Potrero Park Restroom Estate Design and Construction Inc. $31,558.00 Location 3: El Potrero Park Pergola (West) Estate Design and Construction Inc. $23,150.00 Location 4: El Potrero Park Pergola (East) Estate Design and Construction Inc. $16,272.00 Location 5: Victoriano Park Estate Design and Construction Inc. $36,460.00

Award

Playgrounds / Parks / Athletic Fields

$146,100.00

Public - City

Renovation

47

9

7

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
119
Bidding Soon
2,169
All Active Projects
1,007
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

July 27, 2024

img_map_placeholder

To Be Determined, Moreno Valley, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.