BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2024 at 8:00 PM

Updated August 17, 2024

Site work and paving for a road / highway in Hagerstown, Maryland. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Halfway Boulevard Extended Washington County Division of Engineering Invitation to Bid: Halfway Boulevard Extended. DBE Participation (%) 0.2 APL-3(804)E The PROJECT will construct approximately 3200 lf of new roadway from the existing terminus at Newgate Boulevard to the intersection with MD 63 (Greencastle Pike) and Business Parkway. The open section roadway will have 2 lanes in each direction with a curbed, grassed median. There will be 6-foot shoulders draining to bioswales for stormwater management. An existing stream will be crossed using 2-45' wide precast bottomless arch culverts. Traffic barrier and chain link safety fence will be used in the crossing area. A portion of MD63 and Business Parkway will be widened to accommodate the new signalized intersection. A 12" waterline will be extended to the west side of the culverts, and conduits will be placed for future utility crossings. Asphalt paving, striping and signage will be included. The Affirmative Action Contract Goal is 22%. See Contract Provisions for further information and requirements: Submit additional bid inquiries in writing by 4:00 p.m. on Friday, May 24, 2024 addressed to the Division of Engineering, County Administration Annex, 747 Northern Avenue, Hagerstown, MD 21742, or emailed to ECBidQuestions@washco-md.net No questions were asked during the meeting; submit any and all questions in writing

Award

Roads / Highways

$10,131,747.00

Public - County

Paving, Site Work

81

13

7

3

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
425
Active Projects
182
Bidding Soon
2,877
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

August 6, 2024

Project location map

Halfway Blvd, Hagerstown, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.