BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2024 at 8:00 PM

Updated August 8, 2024

Site work for a road / highway in Springfield, Oregon. Completed plans call for site work for a road / highway.

Springfield Utility Board (SUB) seeks a contractor to install underground facilities consisting of one (1) two-inch (2") conduit. The work will consist of directional boring or open trenching at one location. Location: Work will include, but not limited to, installing one (1) two-inch (2") conduit installed per SUB specifications. Install the 2" conduit starting from pole 60032 at 2065 5 th Street to the East 240' to vault 22A121, then East 380' to vault 78E022 at 2122 7th Street.. Contractor shall restore any disturbed landscaping to original condition or better. Contractor is responsible for requesting underground utility locates, private locates, and is responsible for pot holing as necessary. Contractor will acquire Encroachment Permit. Contractor shall provide SUB a copy of all permits prior to commencing work. We do not and shall not discriminate on the basis of race, color, religion (creed), gender, gender expression, age, national origin (ancestry), disability, marital status, sexual orientation, or military status, in any of our activities or operations. These activities include, but are not limited to, selection of volunteers and vendors, and provision of services. We are committed to providing an inclusive and welcoming environment for all volunteers, subcontractors and vendors. CONTRACTOR SHALL SUPPLY 1. 2" Poly, 2" nominal size, (HDPE), SDR 13.5, ATSM F2160, Gray 2. 2" PVC-POLY Coupler, RACEWAY, 2DSDBS80 Or RIDGELINE, 80SWC20 3. 1,250 lb. rated mule tape 4.Bell ends - PVC schedule 40, Gray 5. Glue for conduit and pipe 6. Fill dirt and mulch if needed 7. Fence panel removal and replacement as needed Project Point of Contact: Dave Kandle 541-214-1236 Cell 541-736-3296 Office daveka@subutil.com Bid Questions: Sandi Weston 541-744-3706 Office sandiw@subutil.com Owner Rights: SUB reserves the right to waive minor irregularities or errors contained in the submitted bid, if the intent is clear. However, failure on the bidder's part to request clarification as stipulated above shall obligate the Bidder to abide by SUB's decision as to the intended meaning of any portion of the provision. SUB reserves the right to reject any or all bids. Work to be completed by July 9, 2024 or sooner. If this completion date could not be met, please provide a proposed completion date on bid form.

Award

Roads / Highways

$10,888.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
23
Bidding Soon
327
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

June 20, 2024

Project location map

S 5th St, Springfield, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.