BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and renovation of a military facility in Tobyhanna, Pennsylvania. Completed plans call for the remodel of a military facility.

Project Description: 1. Since the original structure appears to be functioning as designed, the limits of this scope of work are limited to the support of the proposed modifications to the structure including: a. Proposed Roof Top Units (RTU) on the existing roof structure 1) The new RTU on the roof will be analyzed to confirm the existing roof structure is adequate to support the anticipated loads. b. Proposed 50’ x 125’ overhead canopy on the east side of the existing structure. 1) The canopy will be constructed of steel beams and girders, steel columns and spread foundations. 2) The canopy will be used to support truck parking as well as contain Electric Vehicle chargers. 2. For Building 19, the foundations for the original construction consisted of pile foundations. For Building 14, which is a similar structure only a half mile away from Building 19, conventional spread footings were used. The geotechnical report given for this project was for a site about 900 feet away. The proposed foundation for this geotechnical report is a mat slab. It is our belief that a mat slab is not an economical foundation for any foundation work associated with this project. A geotechnical engineer should be consulted to confirm adequacy of the geotechnical report and determine if borings are required. 3. It is our understanding that the undocumented, existing wood truss bearing on CMU walls, on the east end of the building, is requested to be razed. Since there is no documentation available regarding the existing structure, the design of a new steel roof structure was included in the most recent design. The new roof structure will be self- supporting with braces back to the top of the existing CMU so as not to change the load path on the existing CMU walls. 4. Large openings in existing CMU walls, to accommodate new windows, will have to be cut into the existing cmu walls, which will require new lintels. 5. There is a proposed 13’ x 74’ (approximate) addition on the South side of the existing Building 19. This will be used for men and women locker rooms. In our design we intend to have new steel joists bear on the existing south wall with a new CMU foundation wall. But not limited to please review the specifications for more information. Prevailing Wages Apply. Contract duration = 365 calendar days

Post-Bid

Military

$500,000.00

Public - Federal

Remodeling, Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
137
Bidding Soon
2,925
All Active Projects
1,450
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

July 22, 2024

img_map_placeholder

To Be Determined, Tobyhanna, PA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.