BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in New Britain, Connecticut. Completed plans call for the renovation of a two-story above grade, 160-unit residential development.

Waterproofing basements from the inside and the outside. The Housing Authority of the City of New Britain (hereinafter the Authority) is soliciting proposals from licensed Contractors under the laws of the State of Connecticut, to furnish all labor, materials, equipment, and supervision necessary to complete all work as herein specified or reasonably implied relating to Twenty-Seven 2- Story Apartment Building approximately 160 units located in and around Malikowski Circle and Dobek Road to provide Complete Basement Waterproofing for 160 units. Question Deadline 06/21/2024 at 3:00 PM ET Direct General Inquiries To: Tracy Blackwell tblackwell@nbhact.org. NO LATER THAN All Answers and Addendums to the Solicitation will be posted on NBHA's website: online This agreement shall begin on the date of execution and remain in effect for a Period of one (1) year with one (1) one year extension option. Not to exceed two years. During the performance of this contract, the contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, age, sex, national origin, mental disability, physical handicap, or sexual preference. These services will include, but are not limited, to the following: Waterproofing basements from the inside and the outside. Exterior basement waterproofing will consist of excavation around the perimeter down to the foundation. Once the bottom of the footings is visible, the foundation should be cleaned and dried before applying any coatings or membranes. Liquid synthetic membranes like polyurethane and rubberized asphalt should be applied to the Exterior Basements. Pair waterproof coatings with a drainage system that guides high volumes of water away from the building. French drains are to be use for the basement drainage system. Install them in the perimeter trenches before backfilling. Surround the drain with gravel before adding any soil for backfilling. Once the waterproof coating is set and the drainage system is installed, backfill the trench with soil in 6-inch layers. At the 6-inch mark compact the layer before adding more soil. Continue until the trench is backfilled and densely packed. Use Grit sand as a common compacting agent. Interior waterproofing begins with digging a trench around the edges of the basement floor and a sump pit when installing a sump pump. Once the drainage system and pump are installed, seal the basement walls, and replace any wall material that was removed. Apply interior sealants to the interior walls and floors of the basement to prevent moisture from seeping through. Fill/repair any cracks/defects in the basement walls before applying sealant to prevent larger amounts of water from collecting in the wall and damaging it further. Create a continuous channel along the perimeter of the inside of the basement. Install a French drain and connect it to a sump pump system. Install a sump pump at the same time as the French drain. In the corner of the basement, excavate a pit that is a bit larger than the tank for the sump pump. Ensure it connects to the French drain channel on the perimeter. Install the sump pump and tank in the pit, connecting perforated pipe to the tank. Connect the sump pump to a discharge pipe positioned away from the building. Backfill interior French drains with gravel before relaying cement to fix the basement floor.

Post-Bid

Residential Subdivision

$2,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
541
Active Projects
269
Bidding Soon
4,751
All Active Projects
2,176
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2024

August 27, 2024

img_map_placeholder

12 Dobek Rd, New Britain, CT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.