BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2024 at 8:00 PM

Updated August 21, 2024

Site work and paving for a mixed-use development in Marshfield, Wisconsin. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of August 20, 2024 bids received were rejected ,No definite date for the rebid.*** 2024 Sanitary Sewer Projects. Pre-Qualification: Yes Bids will then be reviewed, tabulated, and submitted to the Board of Public Works on Monday, July 1, 2024 for consideration Description: A. S. Maple Avenue Sanitary Sewer, Manhole and Lateral Reconstruction (including Water Services), Central Avenue to 16th Street: The Maple Avenue Sanitary Reconstruction work will generally include sawing, separating, removal, and hauling of existing pavement; excavation; removal of existing mains/manholes/laterals/etc.; installation of new/replacement mains/manholes/laterals/water services/etc.; backfilling and compacting; hauling and disposal of surplus and/or unsuitable material; loading, hauling and placing crushed concrete base material; along with traffic control, erosion control, etc. This project does not include repair or replacement of street pavement, curb & gutter, driveways, sidewalks, etc. Contractor is advised that work by others may be occurring concurrently with the scoped project work, including but not limited to water main replacement by Marshfield Utilities, replacement of gas mains and services, replacement/patching of street pavement/curb & gutter/driveway/sidewalk/etc. by the City of Marshfield Department of Public Works - Street Division; replacement of private-side sanitary sewer laterals by private plumbers; etc. Maple Avenue will be closed to through traffic (without detour) for this reconstruction, however, driveway access shall be maintained to each property at the end of each day. Pedestrian access must be maintained to residential properties at all times. B W. 8th Street Sanitary Sewer Lateral Reconstruction, 1002 and 1006 W. 8th Street: Reconstruction of sanitary laterals at the 8th Street location will generally include sawing, separating, removal and hauling of existing pavement; excavation; removal of existing laterals/main connections/etc.; installation of new/replacement /laterals/main connections/etc.; backfilling and compacting; hauling and disposal of surplus and/or unsuitable material; providing and placing crushed aggregate base course material; and replacement of concrete pavement/curb & gutter/etc., along with traffic control, erosion control, etc. . 8th Street will be closed to through traffic (without detour) for this reconstruction project. Est. Value: $ 500,000.00. Est. Completion Date: Sept. 3, 2024

Final Planning

Water / Sewer

$946,774.00

Public - City

Paving, Site Work

24

5

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
25
Bidding Soon
434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

January 29, 2025

Project location map

Maple Ave, Marshfield, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.