Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a manufacturing facility in Saint Paul, Minnesota. Completed plans call for site work for a manufacturing facility.
Building Management System Upgrades at Pha Properties Phase II All questions arising from this pre-proposal meeting will be addressed by addendum, if necessary. Proposals must be accompanied by a $10,000 bid guarantee, Equal Employment Opportunity form, and a MN Responsible Contractor Compliance Affidavit. The successful proposer will be required to furnish a satisfactory performance bond and separate payment bond. The PHA reserves the right to reject any or all proposals or to waive any informalities in the proposal. Scope of Work 1. Coordinate phasing of all work 2. Provide all temperature control work to replace existing controllers and update sensors and wiring as required. All controllers will be replaced with new BACnet compliant controllers. 3. Provide raceways where required by the National Electrical Code for existing wiring that is not currently compliant. 4. Intent is to use the existing IP/Ethernet connection and as much of the existing RS 485 twisted pair for the Controls LAN (Local Area Network). 5. Existing space temperature sensors will need to be replaced if they are incompatible with new system. Space temperature sensors that are I-stats need to be replaced. Any other temperature sensors connected to DCUs and UCs need to be replaced. 6. Existing controlled devices (valves and damper actuators) will be reused unless they are non-functional. New actuators shall be electric devices tied back to the new controllers. 7. Temperature control system shall be an open system with remote monitoring and alarming capability for major pieces of mechanical equipment. 8. Commissioning: systems shall be commissioned in accordance with the requirements of the Minnesota Energy Code. 9. All systems and components shall comply with BACnet protocol requirements to provide future interoperability. 10. Where applicable, the system shall be able to support Modbus IP or the Modbus RS 485 integration. Newer Fulton Boilers are Modbus RTU (RS 485). 11. IP/Ethernet and RS 485 cabling LAN shall also be BACnet compliant. 12. Provide new updated software with a minimum of 3 control manufacturer programming/configuration tool licenses. 13. Identification: All new panels housing controllers shall be clearly identified with labels identifying the controller(s) contained within the panel enclosure. 14. Wiring work shall be installed/performed by licensed and qualified trades people and licensed contractors.
Award
Manufacturing
$760,446.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2024
August 8, 2024
Multiple Locations, Saint Paul, MN
Related To This Project
Saint Paul, MN
Bid Date: Jul 11 2024
Saint Paul, MN
Bid Date: Sep 05 2024
Saint Paul, MN
Bid Date: Jul 11 2024
Saint Paul, MN
Bid Date: Jul 09 2024
Saint Paul, MN
Bid Date: Jul 09 2024
Saint Paul, MN
Bid Date: Jul 10 2024
Saint Paul, MN
Bid Date: Aug 21 2024
Saint Paul, MN
Bid Date: Jul 23 2024
Saint Paul, MN
Bid Date: Aug 05 2024
Saint Paul, MN
Bid Date: Oct 03 2024
Saint Paul, MN
Bid Date: Jun 28 2024
Saint Paul, MN
Bid Date: Jun 28 2024
Saint Paul, MN
Bid Date: Jun 06 2024
Saint Paul, MN
Bid Date: Jun 06 2024
Saint Paul, MN
Bid Date: Jun 26 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.