BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a manufacturing facility in Saint Paul, Minnesota. Completed plans call for site work for a manufacturing facility.

Building Management System Upgrades at Pha Properties Phase II All questions arising from this pre-proposal meeting will be addressed by addendum, if necessary. Proposals must be accompanied by a $10,000 bid guarantee, Equal Employment Opportunity form, and a MN Responsible Contractor Compliance Affidavit. The successful proposer will be required to furnish a satisfactory performance bond and separate payment bond. The PHA reserves the right to reject any or all proposals or to waive any informalities in the proposal. Scope of Work 1. Coordinate phasing of all work 2. Provide all temperature control work to replace existing controllers and update sensors and wiring as required. All controllers will be replaced with new BACnet compliant controllers. 3. Provide raceways where required by the National Electrical Code for existing wiring that is not currently compliant. 4. Intent is to use the existing IP/Ethernet connection and as much of the existing RS 485 twisted pair for the Controls LAN (Local Area Network). 5. Existing space temperature sensors will need to be replaced if they are incompatible with new system. Space temperature sensors that are I-stats need to be replaced. Any other temperature sensors connected to DCUs and UCs need to be replaced. 6. Existing controlled devices (valves and damper actuators) will be reused unless they are non-functional. New actuators shall be electric devices tied back to the new controllers. 7. Temperature control system shall be an open system with remote monitoring and alarming capability for major pieces of mechanical equipment. 8. Commissioning: systems shall be commissioned in accordance with the requirements of the Minnesota Energy Code. 9. All systems and components shall comply with BACnet protocol requirements to provide future interoperability. 10. Where applicable, the system shall be able to support Modbus IP or the Modbus RS 485 integration. Newer Fulton Boilers are Modbus RTU (RS 485). 11. IP/Ethernet and RS 485 cabling LAN shall also be BACnet compliant. 12. Provide new updated software with a minimum of 3 control manufacturer programming/configuration tool licenses. 13. Identification: All new panels housing controllers shall be clearly identified with labels identifying the controller(s) contained within the panel enclosure. 14. Wiring work shall be installed/performed by licensed and qualified trades people and licensed contractors.

Award

Manufacturing

$760,446.00

Public - City

Site Work

41

11

4

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
82
Bidding Soon
787
All Active Projects
319
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 8, 2024

img_map_placeholder

Multiple Locations, Saint Paul, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.