Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Washington, District of Columbia. Contact the soliciting agency for additional information.
General Annual Piping Inspections of the Capitol Power Plant (CPP) Utility Distribution System (UDS) Tunnels. Short Description On an annual basis, the contractor shall perform a comprehensive piping inspection of the Capitol Power Plant (CPP) Utility Distribution System (UDS). Evaluate the current pipe thickness of steam lines, chilled water lines, and condensate piping systems throughout the UDS to determine discrete locations for piping inspections. Background The Capitol Power Plant (CPP) provides steam and/or chilled water service to twenty-three (23) buildings within the Capitol Complex. Buildings receive steam and/or chilled water service from the network of piping located within the CPP utility tunnels and from direct-buried piping systems. The walkable and utility (non-walkable) tunnels, buried pipelines, and utility vaults are AOC permit-required confined spaces and may contain asbestos-containing material and lead-based painted materials. Objectives The contractor shall perform comprehensive piping inspection of the CPP UDS tunnels (walkable, non-walkable/Utility Vaults, and branch tunnels) to evaluate if the piping still meets the requirements of ASME B31.1 based on the operating and design pressure and temperature of the steam supply, Chilled Water Supply (CWS), high/low pressure condensate return, and Chille Water Return (CWR). Scope The purpose of this solicitation is for the contractor to furnish all labor, materials, supplies, equipment, software, transportation, management, and incidentals to perform site investigations and any evaluations (i.e. pipe stress analysis, life cycle, or other test methods) for preparing an engineering assessment of the steam, chilled water, and condensate distribution system. Assess the current condition of the piping systems in terms of remaining wall thickness, wall loss, corrosion rate, and estimated remaining service life. Evaluate existing and past piping assessment reports (provided for reference only) for piping re-inspection at certain locations as determined which require close monitoring. Identify any system weakness, and immediate and near-term threats of leak or failure. Post compiling of all the information, the contractor shall evaluate if the piping still meets the requirements of ASME B31.1 based on the operating and design pressure and temperature of the steam supply, CWS, high/low pressure condensate return, and CWR. The contractor provides an engineering assessment with remedial recommendations that are safe and effective based on applicable engineering standards and industry best practices. Provide documentation of specific findings and observations contributing to such abnormally higher corrosion activity. Evaluate existing and past piping assessment reports (provided for reference only) for piping re-inspection at certain locations as determined which require close monitoring. Evaluate the current pipe thickness of steam lines (insulated), chilled water lines (insulated), and condensate piping (insulated) systems throughout the UDS to determine discrete locations for piping inspections. Compare the measured thickness with the minimum pipe thickness required by the industry (ASME B31.1). The Contractor shall be responsible for removal of pipe insulation and shall provide pipe cleaning and surface preparation per required guidelines. The contractor shall be responsible for re-insulating the removed insulation post-inspection. Removal, storage, surface preparation, and re-installation of pipe insulation and jacketing within a timely manner to ensure efficient and safe operations of CPP UDS. This work may require coordination with AOC CPP steam line charging, steam line switchover, safety stand-downs, evacuations, and evacuation drills, etc., during the project inspection period. Types of Inspection Types of Inspections (as applicable per ASME B31.1 requirements - inclusive and not limited to): Magnetic Particle Examination Inspect the exposed welds and attachment points for surface defects. Time of Flight Diffraction Ultrasonic (TOFD) Inspect the seam welds for defects. Linear Phased Array (LPA) Ultrasonic Testing Investigate and provide suspected defects. Use encoded LPA to inspect the girth welds. A-Scan and B-Scan Ultrasonic Testing Establish reference locations and scan the piping to generate wall thickness data. Establish surface profile morphology of piping system at reference locations using 3D laser scanning. Energy Dispersive X-Ray Spectrometry Remove representative corrosion samples for elemental analysis. Perform Energy Dispersive X-Ray spectrometry to detect and measure elemental composition. Hardness Inspection Guided Wave Thickness Eddy Pulse Current Report Generate a report with the following contents: Executive Summary, Background, Summary of All Test Results, Detailed Analysis of Individual Test locations, Trend Analysis Graphs, Priority Listing of Tested Areas, Conclusions and Recommendations, and potential addendums, appendix etc. Contract Type: Firm Fixed Price (FFP) Place of Performance / Hours of Operation Capitol Hill and Capitol Power Plant, located at 25 E Street SE, Washington DC 20003. 6:00 AM to 2:30 PM (Monday through Friday). Period of Performance A base contract will be Award Date up to 12 months. Each option year will be for one year after the base year with four (4) option years. Onsite activities related to Piping Inspections of utility distribution lines between the warmer months of May through September of each calendar year weather dependent. Funding For the Base Year and each option period will be subject to the Governments need for services and availability of fiscal year funding. Privacy act All plans, specifications, and photographs in reference to this project are the property of the United States Government. Copying, disseminating, or distributing is prohibited. The contractor shall not release any project information, in any format, without prior written approval by the AOC Contracting Officer (AOC CO) in accordance with AOC52.203-2 and AOC52.203-4. Personal Service This is not a personal services contract. Security In accordance with Clause AOC52.223-5 "Special Security Requirements - Services (Feb 2010) of the contract, within 7 calendar days after date of award the Contractor shall submit to the COR a list of all employees proposed to support this contract. The Contractor shall comply with all AOC security regulations, policies, and procedures. Furthermore, in accordance with Clause AOC52.204-4 "Personal Identity Verification of Contractor Personnel (December 2012)," of the Contract, a copy of the E-Verify case details document evidencing "employment authorized" (final verification request) shall be provided with each request for an AOC ID badge." All Offeror employees shall submit an E-Verify form and a United States Capitol Police background check form (CP-491) prior to working on any task order under the BPA. The Offeror's employees shall also complete an Offeror badging request form. All members of the team working on site will be required to submit to wear an identification badge, that is in visible sight, at all times. On site work may be interrupted because of Congressional events or U.S. Capitol Police requirements. All work to be performed is subject to Government interruptions. Safety The Contractor shall observe all safety precautions throughout the performance of this contract. All AOC, EM 385 1-1, OSHA, and OCWR safety procedures shall be always followed. The work to be performed is in permit-required confined space tunnels, and all entrants must take and submit certifications as proof of successfully completing all required training before entering a tunnel, including, but not limited to, Permit-Required Confined Space, Asbestos Awareness and Heat Stress Prevention. The contractor shall assume full responsibility and liability for compliance with applicable regulations pertaining to the health and safety of personnel during the execution of work and shall hold the AOC harmless for any action on his/her part, or that of his/her employees or subcontractors, which results in illness, injury, or death. Energy Efficiency/Compliance The contractor must follow applicable AOC policies, DC regulations, Environmental Protection Association Regulations, and DC Department of Transportation Regulations. Sustainability This section is not used. Key Personnel The contractor shall staff this project with appropriate subject matter expert (SME) personnel to perform the required scope as described above. Key Personnel shall be administered in accordance with AOC52.211-1, Key Personnel and AOC52.211-2, Approval of Substitute Offeror Personnel. Key personnel may not be removed from the contract without the approval of the CO. Quality Control This will be the responsibility of the contractor for all work performed in the field and before the submission of any documents/records to the AOC must review and certify. Records / Data All records and data produced under this Contract the property of the AOC. The AOC will archive all submitted data for the record. Per deliverables. AOC52.227-2, Unlimited Government Rights (Nov 2004), The Government shall have unlimited rights other work developed in the performance of this contract, including the right to use same on any, for the benefit of the Government, in all drawings, designs, specifications, notes, and other Government work without additional cost to the Government; and with respect thereto the contractor agrees to and does hereby grant to the Government a royalty-free license to all such data which the contractor may cover by copyright and to all designs as to which the contractor may assert any rights or establish any claim under the design patent or copyright laws. The contractor agrees to furnish and to provide access to all such materials at the request of the Contracting Officer. PDFs and Electronic files will be included in every submission. Electronic files must be submitted in Microsoft Excel format. All documents are included in the AOC non-disclosure agreement. The Method of Contractor Selection has not been determined at this Time
Conceptual
Power Plant
Public - Federal
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 30, 2024
25 E St SE, Washington, DC
Related To This Project
Washington, DC
Bid Date: Jun 17 2024
Washington, DC
Bid Date: Aug 05 2024
Washington, DC
Bid Date: Aug 06 2024
Washington, DC
--
Washington, DC
Bid Date: Aug 13 2024
Washington, DC
--
Washington, DC
Bid Date: Jul 22 2024
Washington, DC
Bid Date: Jul 10 2024
Washington, DC
Bid Date: Jul 09 2024
Washington, DC
Bid Date: Jun 14 2024
Washington, DC
Bid Date: Jun 14 2024
Washington, DC
Bid Date: Jun 17 2024
Washington, DC
Bid Date: Jun 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.