Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a clubhouse / community center in Spirit River, Alberta. Design plans call for the construction of a 7,130-square-foot clubhouse / community center; and for site work for a clubhouse / community center.
Plans call for a new multi-use seasonal venue to be located on the west side of 50th Street, between 48th Ave (Elevator Rd.) and 47th Ave. Design and materials are expected to allow for a covered seasonal venue (approx. a structure that is 115'x62') with open walled in summer or closed overhead door in spring and fall design. Vendors may back into stalls and patrons can walk on sit on opposite side. In addition, the venue will need to be complimentary in design to a neighboring park and Town electronic sign (to be constructed at a later date within the vicinity). This project is part of the "Community KINect" initiative by the Spirit River Kinettes Club. TIMELINE: Preliminary planning to commence shortly. The consultant is expected to provide the multi-use seasonal venue conceptual design, with specifications and materials. The consultant will also supply the cost to design and estimate to build the venue at the proposed location. Cost shall include water, plumbing and electrical installation utilizing the existing infrastructure. Design should incorporate a food safe handling station and storage facility for seasonal equipment. Further details and timelines may be confirmed early 2025. *Cost to be determined.
Design
Clubhouse / Community Centers
$2,431,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 14, 2025
50 St, Spirit River, AB
Related To This Project
Spirit River, AB
--
Spirit River, AB
Bid Date: Apr 30 2024
Spirit River, AB
Bid Date: Apr 23 2024
Spirit River, AB
--
Spirit River, AB
--
Spirit River, AB
Bid Date: Aug 09 2023
Spirit River, AB
Bid Date: Jul 27 2023
Spirit River, AB
Bid Date: May 09 2023
Spirit River, AB
Bid Date: Sep 13 2018
Spirit River, AB
Bid Date: Aug 04 2021
Spirit River, AB
Bid Date: Oct 20 2021
Spirit River, AB
--
Spirit River, AB
Bid Date: Jul 11 2022
Spirit River, AB
--
Spirit River, AB
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.