BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2024 at 8:00 PM

Updated May 1, 2024

Site work for a road / highway in Spirit River, Alberta. Completed plans call for site work for a road / highway.

Supply and Installation of Chip Seal Application, Road Pavement Markings and Other Work Chip Seal Coat on Range Road 93 From: Hwy. 681 (Km 5.013) To: Township Road 830 (Km 17.935) Length 12.922 KM on Range Road 102 From:1.6 km South of Hwy 49 (Km 5.60) To: Hwy 49 (Km 7.215) Length: 1.615 Km Approximate Quantities: RR 93 (Schedule “A”) Chip Seal Coat (Des 3, Cl 12.5BW) 96,915 m2 Roadway Lines – Supply Paint and Painting 25.84 km RR 102 (Schedule “B”) Chip Seal Coat (Des 3 Cl 12.5 BW) 12,500 m2 Roadway Lines – Supply Paint and Painting 3.2 km Documents can be obtained from https://buildworkscanada.com

Post-Bid

Roads / Highways

$500,000.00

Public - County

Site Work

3

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
6
Bidding Soon
80
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

June 1, 2024

Project location map

Multiple Locations, Spirit River, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.