BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a clubhouse / community center in Spirit River, Alberta. Design plans call for the construction of a 7,130-square-foot clubhouse / community center; and for site work for a clubhouse / community center.

Plans call for a new multi-use seasonal venue to be located on the west side of 50th Street, between 48th Ave (Elevator Rd.) and 47th Ave. Design and materials are expected to allow for a covered seasonal venue (approx. a structure that is 115'x62') with open walled in summer or closed overhead door in spring and fall design. Vendors may back into stalls and patrons can walk on sit on opposite side. In addition, the venue will need to be complimentary in design to a neighboring park and Town electronic sign (to be constructed at a later date within the vicinity). This project is part of the "Community KINect" initiative by the Spirit River Kinettes Club. TIMELINE: Preliminary planning to commence shortly. The consultant is expected to provide the multi-use seasonal venue conceptual design, with specifications and materials. The consultant will also supply the cost to design and estimate to build the venue at the proposed location. Cost shall include water, plumbing and electrical installation utilizing the existing infrastructure. Design should incorporate a food safe handling station and storage facility for seasonal equipment. Further details and timelines may be confirmed early 2025. *Cost to be determined.

Design

Clubhouse / Community Centers

$2,431,000.00

Public - City

New Construction, Site Work

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
6
Bidding Soon
79
All Active Projects
23
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 14, 2025

August 31, 2026

img_map_placeholder

50 St, Spirit River, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.