BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated May 13, 2025

Demolition, site work, renovation and addition to an educational facility in Harrisonburg, Virginia. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

.Summary:The College of Health and Behavioral Studies expansion is a 5-story, 125,367 gross square foot building will be located to the southeast of the existing Health and Behavioral Studies building. A transparent, Circulation Bridge will connect the two buildings. Major program spaces in the project include community-oriented, state-of-the-art clinic space, along with administrative support spaces. A new patient drop-off area will be located between the new building and the existing Grace Street parking deck. Patient families and caregivers will be provided dedicated parking in the Grace Street parking deck and Wine Price parking lot. Included in scope is additional classrooms and labs for our nursing and kinesiology programs. The buildings public activity will be very visible from MLK Jr. Way, and pedestrian paths and open spaces will flank it. The new College of Health and Behavioral Studies addition embraces JMU's environmental commitment. Environmental stewardship is expressed in the use of energy efficiency standards in its design including: the generous use of natural light, energy-efficient sys-tems, reduced water usage, and an overall compressed footprint to minimize site disturbance. The CHBS-Phase 2 project will be situated to the east of the current College of Health and Behavioral Studies building. A transparent circulation bridge will link the two structures. Key features of this project will include community-focused, cutting-edge clinical spaces, teaching and simulation laboratories, classrooms, areas for student support and study, as well as administrative and faculty support facilities. This new building will consolidate several departments that are currently dispersed across the campus. Additionally, a new patient drop-off area will be positioned next to the new facility. Question Deadline: 04/28/2025 at 5:00 PM ET All inquiries for information shall be submitted in writing by e-mail To: Autumn Foster e-mail: delli2ad@jmu.edu

Post-Bid

Educational

$42,000,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
64
Bidding Soon
994
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2025

July 1, 2026

Project location map

752 Ott St, Harrisonburg, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.