Site work and paving for a sidewalk / parking lot in Holly Springs, Georgia. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Replacement and grinding of sidewalk sections and the removal of street trees and stumps throughout the City of Holly Springs and the installation of sod in the grass strips between the curb and sidewalk after removal of the street trees. The approximate extent and character of the Work is generally described as follows: Replacement and grinding of sidewalk sections and the removal of street trees and stumps throughout the City of Holly Springs and the installation of sod in the grass strips between the curb and sidewalk after removal of the street trees. Bidders shall inform themselves concerning Georgia Laws and comply with same. The time allowed for Substantial Completion is 120 consecutive days from the date specified in the Notice to Proceed. Nonrefundable liquidated damages in the amount of $300 per calendar day will be deducted from monies due the Contractor in the event that a portion of the work remains incomplete beyond the agreed upon contract completion date. The official Notice to Proceed is anticipated to be given to the chosen contractor in August 2024. Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five percent (5%) of the total amount payable by the terms of the contract or, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. The Successful Bidder will be required to furnish a performance bond for 100% of the contract amount and a payment bond for 100% of the contract amount, with the executed Agreement meeting the requirements of the Contract Documents and executed on the forms attached to the Agreement. The terms and time for payment are set forth in the Agreement. Surety and insurance companies must have an AM Best rating of A-6 or greater, be listed in the Federal Registry of Companies holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia. Requests for payments are due by the Fifth (5th) of the month for payment by the Twentieth (20th) of the month less 5% retainage. Retainage will be held until final acceptance of the project by the City of Holly Springs. All Bids will remain subject to acceptance for 60 days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. Each bid must be submitted in a SEALED ENVELOPE addressed to the OWNER. Each sealed envelope containing a Bid must be plainly marked on the outside as, bid for "Holly Springs City-Wide Sidewalk Repair and Street Tree Removal Project", and the envelope should bear on the outside the name and address of the bidder. If the bid is forwarded by mail, the sealed envelope containing the Bid must be enclosed in a separate mailing envelope to the attention of the OWNER. The mailing address is P.O. Box 990 Holly Springs, GA 30142. Bids may be hand-delivered to Holly Springs City Hall at 3237 Holly Springs Parkway, Holly Springs, GA 30115. The Owner reserves the right to reject any or all Bids, to waive formalities and re-advertise. Questions related to the Bid or regarding the bid process should be directed to Robert H. Logan at rlogan@hollyspringsga.us. Please communicate via email so there is a record of correspondence. Locations- 300 Abbey Court 301 Abbey Court 415 Argonne Terrace 419 Argonne Terrace 420 Argonne Terrace 424 Argonne Terrace 426 Argonne Terrace 428 Argonne Terrace 430 Argonne Terrace 431 Argonne Terrace 436 Argonne Terrace 438 Argonne Terrace 444 Argonne Terrace 448 Argonne Terrace 903 Duncan Terrace 905 Duncan Terrace 913 Duncan Terrace 915 Duncan Terrace 917 Duncan Terrace 270 Harmony Lake Drive 274 Harmony Lake Drive 284 Harmony Lake Drive 286 Harmony Lake Drive 287 Harmony Lake Drive 290 Harmony Lake Drive 293 Harmony Lake Drive 296 Harmony Lake Drive 298 Harmony Lake Drive 300 Harmony Lake Drive 302 Harmony Lake Drive 314 Harmony Lake Drive 801 White Oak Terrace 702 Poplar Way 705 Poplar Way 402 Serena Lane 403 Serena Lane 404 Serena Lane 900 Marabella Lane 2 902 Marabella Lane 2 910 Marabella Lane 1 920 Marabella Lane 1 924 Marabella Lane 5 932 Marabella Lane 1 934 Marabella Lane 2 936 Marabella Lane
Award
Sidewalks / Parking Lot
$173,455.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2024
August 1, 2024
Multiple Locations, Holly Springs, GA
Related To This Project
Holly Springs, GA
Bid Date: Jul 11 2024
Holly Springs, GA
Bid Date: Jul 11 2024
Holly Springs, GA
Bid Date: Jul 11 2024
Holly Springs, GA
Bid Date: Aug 07 2024
Holly Springs, GA
Bid Date: Aug 09 2024
Holly Springs, GA
Bid Date: Dec 13 2024
Holly Springs, GA
Bid Date: Jan 09 2025
Holly Springs, GA
Bid Date: Jun 27 2024
Holly Springs, GA
--
Holly Springs, GA
--
Holly Springs, GA
--
Holly Springs, GA
Bid Date: May 09 2024
Holly Springs, GA
--
Holly Springs, GA
Bid Date: Jul 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.