BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Elloree, South Carolina. Completed plans call for site work for a water / sewer project.

Div. A-1: Approx. 741-LF of 8" water main and all other appurtenances. Div. A-2: Refurbishment of the Hampton Street well including new electrical, piping, and chemical building. Bid sets must be obtained directly from American Engineering Consultants, Inc. Contact Laura Stritzinger at lstritzinger@aec-sc.com. All project related questions must be directed to Chris Waddell, P.E. at American Engineering Consultants, Inc. by email cwaddell@aec-sc.com or by fax (803-791-8110) Any inquiry received before the close of business on Friday July 19, 2024 shall be given consideration. Base Bid Division A-1: Replacement of existing water mains with approximately 740-LF of new 8" water main and approximately 38-LF of 6" water main along Hampton Street in Elloree between Railroad Avenue and Highway 6. Project also includes connections to existing water mains, installation of gate valves, a fire hydrant assembly, restrained joint fittings, water service connections, removal and replacement of asphalt roadway and asphalt driveways, milling and overlay of asphalt roadways, removal and replacement of concrete sidewalks, abandonment of existing water mains, and all other necessary appurtenances as specified and depicted in the Contract Documents. Base Bid Division A-2: Refurbishment of the Town of Elloree's Hampton Street well. The refurbishment will include construction of: chemical cleaning of existing well, replacement of existing well pump and piping, yard piping and fittings, a chemical building with chemical equipment, a chemical storage building, site work, an electrical rack and canopy, electrical equipment and improvements, and tie-in of the new yard piping to the water distribution system. The project also includes demolition of an existing ground storage tank, booster pump station, and storage building that are located at the Hampton Street well site. Bid Result, DIVISION A-1 BID: Shady Grove Construction LLC $252,488.00 DIVISION A-2 BID: AAA Utility and Construction LLC $1,132,460.00

Bid Results

Water / Sewer

$1,384,948.00

Public - County

Site Work

22

18

7

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
56
Bidding Soon
658
All Active Projects
305
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2024

September 23, 2024

img_map_placeholder

2623 Cleveland St, Elloree, SC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.