BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Williamsport, Pennsylvania. Conceptual plans call for site work for a water / sewer project.

Davidson Township Sewer Authority provides wastewater and sewage treatment for the Village of Sonestown. The Village of Sonestown is in a rural area of Sullivan County and has about 200 residents. The village has no access to public water supplies and the residents and businesses utilize wells for the drinking water. The original treatment plant is failing and is at the end of its functioning lifespan. The current Sand Distribution System experiences clogging and bio-growth in the distribution piping that does not allow the wastewater to distribute evenly throughout the surface of the sand filters. The Village of Sonestown sits along Muncy Creek and has experienced many high-water events that have disrupted the operation of the plant. These events can cause an overflow of sewage due to cracks and breaks in the gravity lines. The residents have settling tanks that need to be pumped out on a continual basis and some have become displaced during high water events. In 2023, the Sonestown Sewer System Improvements project (Phase I) addressed the immediate concerns that affected the plant's current operation. Five new pumps and control panels were installed in the Main Street pump station and the Wastewater Treatment Plant (WWTP). Inflow and Infiltration issues were also addressed at the Main Street Pump Station. Some preliminary design work, including initial mapping, site layouts, and invoices for previous work, will be available to the selected consultant for their considered use. Phase II is vital for the integrity of the system and to provide uninterrupted service for decades to come to the Village of Sonestown. Phase II of the Sonestown Sewer System project will utilize new sewer lines throughout the entire village replacing the deteriorating gravity system and will include a new package treatment plant. The new treatment plant will provide advanced wastewater treatment and needs to be safe from the risk of flooding during high-water events, making the new plant flood resistant. If the existing settling tanks are to be used, grinder pumps will need to be installed in each tank. These proposals are to be used as a reference by the engineer, but the parties interested are open to changes that will increase efficiency and lower the cost of construction and maintenance. All design suggestions will be reviewed by all interested parties and incorporated into the final design plan as necessary The scope of work in this project includes the complete installation of the following: New Wastewater Treatment Package, designed to withstand flood water inundation. Installation of new sewer lines throughout the system. The design will be at the discretion of the retained engineer. Resident project representative services Sullivan County proposes to use a recently approved Community Development Block Grant to request quotes for the purchase of professional Engineering services. The following narrative outlines the major responsibilities of the proposers. These responsibilities include the entire project from design to final inspection. It should be recognized by all proposers that the Scope of Services included herewith might exclude some minor, incidental Engineering responsibilities not currently identifiable. Sullivan County reserves the right to accept or reject any and all quotations or to waive any irregularities. Questions regarding this quotation should be directed to: Cody Hoover, Project Coordinator SEDA-COG 201 Furnace Road Lewisburg, PA 17837 570-524-4491 choover@seda-cog.org The method of Contractor Selection has not been Determined at this time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.Around $900,000 to $1,000,000.

Conceptual

Water / Sewer

$1,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
44
Bidding Soon
687
All Active Projects
324
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

img_map_placeholder

Multiple Locations, Williamsport, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.