BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in West Sacramento, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The State Streets Pavement Rehabilitation Project encompasses a comprehensive set of tasks aimed at restoring and upgrading the neighborhood's road infrastructure. Paving and surface treatment tasks involve of slurry seal and 6-inch hot mix asphalt. West Sacramento is a vibrant riverfront community centrally located in Northern California. West Sacramento shares the Sacramento River with neighboring Sacramento, with the deep water ship canal serving the Port of Sacramento. Incorporated in 1987, West Sacramento encompasses approximately 22 square miles, with a population just over 53,000 people. The City is full-service with nine (9) departments and over 400 full-time employees. The City provides the full range of municipal services including police and fire protection, park, street, fleet, and facility maintenance, economic development and housing, community development, capital projects, and parks and recreation. The City also provides water, wastewater, and solid waste services. The State Streets Pavement Rehabilitation Project encompasses a comprehensive set of tasks aimed at restoring and upgrading the neighborhood's road infrastructure. Paving and surface treatment tasks involve applying over 50,000 SY of slurry seal and over 17000 Tons of 6-inch hot mix asphalt. A Storm Water Pollution Prevention Plan (SWPPP) will be implemented to mitigate stormwater pollution during construction. Storm drain and drainage adjustments include removing and replacing a storm drain pipe, and resetting drainage inlets. Various concrete works will be undertaken, including sidewalk curb ramps, valley gutters, curb and gutter. Payment for the project will be based on the actual quantities installed or constructed, as specified in the bid schedule. Contact Information Bridget McGinnis Assistant Engineer 1110 W Capitol Ave 1st Floor West Sacramento, CA 95691 Email: bridgetm@cityofwestsacramento.org Phone: (916) 617-5033 Question Submission Deadline:July 10, 2024, 5:00pm Question Response Deadline:July 16, 2024, 5:00pm City Council Award Date: August 21, 2024 Right of Rejection The City reserves the right, at its sole discretion, to reject any and all Proposals, no matter their level of responsiveness, or to cancel this ITB in its entirety. A Proposer must comply with all of the terms and instruction of this ITB, and all applicable state and local laws and regulations. Any Proposal that does not meet the requirements of this ITB may be considered to be nonresponsive and rejected. A Proposer may not restrict the rights of the City or otherwise qualify a Proposal. If a Proposer does so, the City may determine the Proposal is a nonresponsive counteroffer, and the Proposal may be rejected. The City reserves the right, at its sole discretion, to waive variances in a Proposal, provided such action is in the best interest of the City. Where the City waives variances in a Proposal, such waiver does not modify the ITB requirements or excuse the Proposer from full compliance with the ITB. Notwithstanding any variance, the City may hold any Proposer to strict compliance with the ITB.

Award

Roads / Highways

$6,521,630.00

Public - City

Paving, Site Work

22

15

127

5

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
82
Bidding Soon
1,551
All Active Projects
647
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2024

October 1, 2024

img_map_placeholder

Multiple Locations, West Sacramento, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.