Site work for a civil project in Wentzville, Missouri. Completed plans call for site work for a water / sewer project.

The Contractor will be required to construct 8,700 linear feet of 16" ductile iron pipe water transmission main. The project contains a connection to an existing 16" main at the Highway Z and N intersection thence south to the District's pump station located east of Highway Z. The design includes careful planning to avoid existing utilities and coordinating with utility providers to aid in minimizing impact to adjacent properties. The design also includes thrust block sizing and restrained joint length calculations. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received after July 22, 2024 may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. A Bid Bond in the amount of five (5) percent of the Bidder's maximum Bid Price is required to be submitted with the Bid, on the form enclosed. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder's maximum Bid price and in the form of a certified check, bank money order, or a Bid bond (on the form attached) issued by a surety meeting the requirements of Paragraphs 5.01 and 5.02 of the General Conditions. The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner's. ARTICLE 9-CONTRACT TIMES The Notice to Proceed shall be issued within 45 calendar days after the Notice of Award pending completion of easement acquisition. Issuance of Notice to Proceed shall also be contingent on Contractor providing required documents, subject to approval by Owner, including prior certifications of insurance. Provisions concerning contract times are set forth in the agreement. The project shall meet the criteria of being Substantially Complete, subject to approval by Owner. only after all water mains have been completely installed and after successful pressure and bacteriological testing. The question period will conclude on July 22, 2024, at close of business. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received after July 22, 2024 may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect

Award

Water / Sewer

$1,772,000.00

Public - City

Site Work

28

8

4

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
48
Bidding Soon
864
All Active Projects
338
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2024

August 8, 2024

img_map_placeholder

Hwy Z, Wentzville, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.