Site work for a civil project in Wentzville, Missouri. Completed plans call for site work for a water / sewer project.
The Contractor will be required to construct 8,700 linear feet of 16" ductile iron pipe water transmission main. The project contains a connection to an existing 16" main at the Highway Z and N intersection thence south to the District's pump station located east of Highway Z. The design includes careful planning to avoid existing utilities and coordinating with utility providers to aid in minimizing impact to adjacent properties. The design also includes thrust block sizing and restrained joint length calculations. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received after July 22, 2024 may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. A Bid Bond in the amount of five (5) percent of the Bidder's maximum Bid Price is required to be submitted with the Bid, on the form enclosed. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder's maximum Bid price and in the form of a certified check, bank money order, or a Bid bond (on the form attached) issued by a surety meeting the requirements of Paragraphs 5.01 and 5.02 of the General Conditions. The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner's. ARTICLE 9-CONTRACT TIMES The Notice to Proceed shall be issued within 45 calendar days after the Notice of Award pending completion of easement acquisition. Issuance of Notice to Proceed shall also be contingent on Contractor providing required documents, subject to approval by Owner, including prior certifications of insurance. Provisions concerning contract times are set forth in the agreement. The project shall meet the criteria of being Substantially Complete, subject to approval by Owner. only after all water mains have been completely installed and after successful pressure and bacteriological testing. The question period will conclude on July 22, 2024, at close of business. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received after July 22, 2024 may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect
Award
Water / Sewer
$1,772,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 26, 2024
August 8, 2024
Hwy Z, Wentzville, MO
Related To This Project
Wentzville, MO
Bid Date: Aug 02 2024
Wentzville, MO
Bid Date: Jul 19 2024
Wentzville, MO
Bid Date: Jul 18 2024
Wentzville, MO
Bid Date: Jul 19 2024
Wentzville, MO
--
Wentzville, MO
Bid Date: Aug 15 2024
Wentzville, MO
Bid Date: Aug 22 2024
Wentzville, MO
Bid Date: Aug 29 2024
Wentzville, MO
Bid Date: Jun 21 2024
Wentzville, MO
Bid Date: Jul 09 2024
Wentzville, MO
Bid Date: Jun 06 2024
Wentzville, MO
Bid Date: May 31 2024
Wentzville, MO
--
Wentzville, MO
Bid Date: May 23 2024
Wentzville, MO
Bid Date: May 13 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.