Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 5, 2024 at 8:00 PM
Updated July 6, 2024
Site work and paving for a mixed-use development in Mariposa, California. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The County reserves the right to retain all proposals submitted and to use any idea(s) included in a proposal regardless of whether that proposal is selected. Contractor shall comply with all federal, state and local laws, codes, ordinances and regulations applicable to Contractor’s performance under this Agreement, including, but not limited to, laws related to prevailing wages. Specifically, Contractor shall not engage in unlawful employment discrimination, including, but not limited to, discrimination based upon a person’s race, religion, color, national origin, ancestry, physical handicap, medical condition, marital status, gender, citizenship or sexual orientation, as prohibited by state or federal law. Fournier Road between Joe Howard Street and Antone Road. Approximately 1,000 feet of 2-lane road with sidewalk against the cemetery side of the right-of-way A 60-foot bridge over Mariposa Creek connecting to Antone Road at the Creekside Terrace Apartments
Conceptual
Roads / Highways
$400,000.00
Public - County
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 25, 2025
Fournier Rd, Mariposa, CA
Related To This Project
Mariposa, CA
Bid Date: Aug 09 2024
Mariposa, CA
Bid Date: Aug 27 2024
Mariposa, CA
--
Mariposa, CA
--
Mariposa, CA
Bid Date: Sep 17 2024
Mariposa, CA
Bid Date: Sep 25 2024
Mariposa, CA
--
Mariposa, CA
Bid Date: Mar 03 2025
Mariposa, CA
Bid Date: May 21 2024
Mariposa, CA
Bid Date: May 10 2024
Mariposa, CA
Bid Date: May 01 2024
Mariposa, CA
Bid Date: May 14 2024
Mariposa, CA
Bid Date: Feb 27 2024
Mariposa, CA
Bid Date: Feb 27 2024
Mariposa, CA
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed