BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Toronto, Ontario. Contact the soliciting agency for additional information.

Reference Number 0000273023 Question Acceptance Deadline 2024/07/11 02:00:00 PM EDT .1On Roof Area 1.1: Remove Existing Roof System Components, Projection and Perimeter Flashings, and Old Appurtenances Down to Existing Roof Deck in Preparation for Installation of a New Mod. Bit. Inverted Roof System. Replacement Work to Be in Accordance With Section 07 52 11. .1remove Existing Roof System Components Down to Expose Existing Bur Membrane Deck Surface and Dispose of Debris to an Appropriate Site. 2relocate or Temporarily Remove Existing Stone Ballast and Concrete Pavers as Required to Facilitate New Membrane Installation and Store for Re-use in New Roof Assembly. .1do Not Structurally Overload Roof by Placing Stone Ballast in Large Piles and Concrete Pavers in Tall Stacks. Ensure Ballast Weight is Adequately Distributed Across Roof at All Times, or Temporarily Remove Ballast From Roof and Store at Ground Level Staging Area. .3remove and Discard Broken, Damaged, or Cracked Concrete Pavers. Power Scrape Existing Roof Membrane to Remove Top Pour and Any Pieces of Extruded Polystyrene Insulation Embedded Within the Asphalt. 4power Vacuum Existing Membrane to Remove Loose Debris. .1where Existing Concrete Deck is Exposed, Review Surface of Deck for Damage and Deterioration That May Impact New Roof System Installation. Repair Concrete Decking With Quick Dry Mortar Mix as Required. .5install New Wood Blocking and Plywood at Perimeters and Curbs as Required. .1prime All Exposed Wood, Concrete, Gypsum Board, and Metal Surfaces Where Required to Receive New Membrane and Flashings. 6install a Layer of 13mm (0.5") Siliconized Gypsum Roof Board Across Substrate in Ribbons of Foamble Polyurethane Roofing Adhesive. The term of the Final Agreement is approximately twelve (12) months or the completion of the project, whichever is longer, followed by the warranty period. The substantial completion of the project is expected to be on or before December 2024. A Labour and Material Payment Bond in an Amount Equal to Not Less Than 50% of the Contract Price, Including All Applicable Taxes; and A Performance Bond in an Amount Equal to Not Less Than 50% of the Contract Price, Including All Applicable Taxes. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Educational

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
458
Active Projects
248
Bidding Soon
4,514
All Active Projects
1,765
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 18, 2024

August 19, 2024

August 19, 2025

img_map_placeholder

Multiple Locations, Toronto, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.