Site work and renovation of a civil project in Sandy, Utah. Completed plans call for the renovation of a road / highway; for site work for a road / highway; and water / sewer project.

The Work of this Contract comprises the construction of repairs to the existing Southwest Groundwater Treatment Plant Finished Water Reservoir. The Work generally includes concrete crack repairs and placement of lightweight cellular concrete to add slope to the existing reservoir deck; installation of roofing membrane and traffic pad; installation of metal ladders, guardrail, and exterior metal stairs and platform; modifications to existing roof drain and downspout system; new concrete flat-work, restoration of disturbed areas, and all other appurtenant work. SITE OF WORK: The Work is located at the Southwest Groundwater Treatment Plant, immediately east of the Jordan Valley Water Conservancy District office (8215 S 1300 W, West Jordan, Utah) as shown in the Drawings. CONTRACTOR QUALIFICATIONS: Bidders shall note that this project requires interested contractors to meet certain qualification standards in order for bids to be considered responsive. Bids that do not meet these requirements will not be considered for award. Refer to Instructions to Bidders for further information. COMPLETION OF WORK: All work shall be substantially completed by November 22, 2024, with final completion by January 6, 2025. AWARD OF CONTRACT: An Award of Contract, if it were awarded, will be made within 60 calendar days of the opening of bids. BID SECURITY: Each bid shall be accompanied by a certified or cashier's check, money order or bid bond in the amount of five percent of the total bid price payable to the Jordan Valley Water Conservancy District as a guarantee that the bidder, if its bid is accepted, will promptly execute the contract, provide evidence of worker's compensation insurance, and furnish a satisfactory faithful performance bond in the amount of 100 percent of the total bid price and a payment bond in the amount of 100 percent of the total bid price. OWNER'S RIGHTS RESERVED: The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the Owner.

Award

Water / Sewer

$419,170.00

Public - County

Renovation, Site Work

16

12

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
32
Bidding Soon
503
All Active Projects
190
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2024

August 19, 2024

img_map_placeholder

8215 S 1300 W, Sandy, UT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.