BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in Coralville, Iowa. Completed plans call for the renovation of a medical facility.

UIHC Iowa River Landing Ambulatory Care Facility - LL Pathology Equipment Replacement General Description of Work: This project consists of new floor finishes (including drain relocation) and mechanical, electrical and plumbing Work associated with the replacement and relocation of existing Sysmex and Roche Diagnostics equipment. The project site consists of 1,645 square feet of lab space in Room 0401- Pathology Lab on the Lower Level of Iowa River Landing. 1) Alternates: None. 2) Allowances: None. 3) Unit Prices: None. e. Work by Owner: 1) MEPT Commissioning. (Seven (7) VRF Indoor Units, two (2) Dry-Coolers, two (2) Pumps, HP-1 Modules, Review operation of two existing FCU's, Lighting Controls) 2) Procurement of New Pathology Lab equipment, modular casework, mobile furnishings (chairs, carts, similar). 3) Temporary and final equipment staging / moving. 4) Lockset permanent cores and final keying Work Sequence: Constructor shall complete all work identified in each Phase within the durations scheduled below: 0) Phase 0 within 0 calendar days. (All work in this phase is by Owner and will be complete prior to start of Constructor's Work on-site.) 1) Phase 1 within 0 calendar days. (All work in this phase is by Owner.) 2) Phase 2 within 0 calendar days. (All work in this phase is by Owner. Allow up to 84 calendar days for equipment validation by Owner.) 3) Phase 3 within 14 calendar days. (Allow for equipment validation by Owner.) 4) Phase 4 within 14 calendar days. (Allow up to 21 calendar days for testing and Commissioning activities by Owner.) 5) Phase 5 within 0 calendar days. (All work in this phase is by Owner. Allow for equipment validation by Owner.) 6) Phase 6 within 28 calendar days. 7) Phase 7 within 14 calendar days. 8) Phase 8 within 7 calendar days. 9) Phase 9 within 0 calendar days. (All work in this phase is by Owner.) 10) A Substantial Completion certificate will be issued when work is completed to the satisfaction of the Owner and Design Professional.

Award

Medical

$989,700.00

Public - State/Provincial

Renovation

47

22

2

5

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
31
Bidding Soon
506
All Active Projects
208
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2024

September 16, 2024

img_map_placeholder

105 E 9th St, Coralville, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.