BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Diego, California. Completed plans call for site work for a water / sewer project.

Hollister Quarry Wetland Mitigation Project. Estimated Bid Value $2,640,000 Scope of Services SCOPE OF WORK: The Hollister Quarry Mitigation Project (Project) was designed to provide compensatory mitigation for past City of San Diego (City) Storm water Department channel maintenance impacts and to also provide Advanced Permittee Responsible Mitigation (APRM) for future storm water channel maintenance projects identified in the City's Municipal Waterways Maintenance Plan and associated Final Environmental Impact Report (MWMP; Dudek 2020). The 2.46-acre mitigation site (consisting of 2.36 acres of planned mitigation credits and 0.10 acre of planted buffer) is located on one City-owned parcel (Assessor Parcel Number 6280510200) within the Otay Valley Regional Park (OVRP) and is entirely within the City's Multiple Species Conservation Program's (MSCP; City 1997) Multi-Habitat Planning Area (MHPA). The Project consists of the re-establishment and rehabilitation of riparian scrub habitats for wetland mitigation credits by removing quarry spoils and the dominant and highly invasive non-native giant (Arundo donax), lowering of existing uplands (disturbed land) adjacent to (and south of) the existing riverbed to expand the area capable of supporting wetland hydrology and vegetation, and planting/seeding with native species typical of southern willow scrub (e.g., riparian scrub) and mule fat scrub (e.g., transitional riparian scrub) vegetation communities. Re-establishment and rehabilitation shall be conducted within the designated mitigation site (and utilize the designated staging area) at locations identified on the Construction Documents. The work schedule is defined by an installation phase and a post-construction 120-day plant establishment period (Project contract period). The 5-year maintenance and monitoring period described in the Project's Habitat Mitigation and Monitoring Plan (HMMP; December 2021) will be completed under a separate contract and is not a part of this Project contract period. The 5-year maintenance and monitoring period described in the Project's Habitat Mitigation and Monitoring Plan (HMMP; December 2021) will be completed under a separate contract and is not a part of this Project contract period. Question Deadline 07/23/2024 Any questions related to this solicitation shall be submitted to: Brittany Friedenreich at BFriedenreic@sandiego.gov 10.2. Questions received less than 14 days prior to the date for opening of Bids may not be considered.

Bid Results

Water / Sewer

$2,761,454.00

Public - City

Site Work

20

5

4

7

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
69
Bidding Soon
864
All Active Projects
440
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 6, 2024

October 7, 2024

August 15, 2025

img_map_placeholder

389 Hollister St, San Diego, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.