BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2024 at 8:00 PM

Updated September 10, 2024

Site work for a water / sewer project in Wolf Point, Montana. Completed plans call for site work for a water / sewer project.

The project consists of two schedules. Schedule One consists of the replacement of approximately 1,980 linear feet of 18-inch vitrified clay pipe (VCP) sewer main with new 8-inch PVC sewer main. Schedule Two consists of the replacement of approximately 1,025 linear feet of 18-inch VCP sewer main with new 8-inch PVC sewer main. Where sewer main replacement occurs, the installation of new manholes, lining existing manholes, and reinstating sewer services will also occur. Location Details City: Wolf Point County: Roosevelt State/Province: MT Bidders will be charged a fee of $42.00 to submit a bid electronically. In addition, the Drawings and Project Manual may also be examined at online. All questions about the meaning or intent of the Contract Documents are to be submitted in writing to and must be received by Great West Engineering no later than 5:00 PM local time on July 18, 2024. Questions received after this date will not be answered. Oral questions will only be accepted at the PreBid conference. Written comments may be submitted to Greg Lukasik of Great West Engineering by mail at: 6780 Trade Center Avenue, Billings, MT 59101 or email at: glukasik@greatwesteng.com. Question Deadline 07/18/2024 at 5:00 PM MT

Award

Water / Sewer

$1,313,355.00

Public - City

Site Work

14

26

6

8

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
5
Bidding Soon
25
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

August 26, 2024

Project location map

Multiple Locations, Wolf Point, MT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.