Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2025 at 8:00 PM

Updated May 10, 2025

Site work and paving for a road / highway in Sudbury, Massachusetts. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of May 9, 2025, an engineer has been selected and this project is in the design phase. It is anticipated construction will start early July 2029. *The closed solicitation has been included below for reference: The intent of this capital construction project is to improve operations at the West Three Forks Interchange on Interstate 90. The SINGLE POINT OF CONTACT, including Q&A is Kelly Williams who can be reached at (406) 444-7961 or kwilliams@mt.gov. The intent of this capital construction project is to improve operations at the West Three Forks Interchange on Interstate 90. Proposed improvements include intersection and ramp modifications to address current and future operational needs. Public outreach will be required to communicate with stakeholders and the public. Firms will be evaluated and selected based on their qualifications to complete PE phases, including all expertise required to provide comprehensive design services necessary for the project, including (but not limited to) roadway design; structures analysis and design; traffic engineering and operations analysis and design; hydraulics, survey, environmental, public involvement, R/W design, and potentially R/W acquisition. An alternative analysis is needed to consider traffic patterns (current and future), ramp functionality, intersection improvement options, safety and operations considerations, possible bridge construction options, environmental issues, right-of-way, utilities, geometrics and/or any other factors necessary to determine a preferred improvement alternative at this interchange. The end result of the alternative analysis will be a project recommendation (outlining the preferred alternative and costs associated with this alternative). By submitting a proposal, it is understood your firm has capacity to complete the work requested in a timely manner (in accordance with the negotiated schedule) and that you have an internal quality assurance/quality control process achieving industry standard expectations for quality. This project is in Broadwater County on National Highway Interstate Route 90 beginning at RP 272.7+/- and extending to RP 273.3+/-. The method of Contractor Selection has not been Determined at this time.

Design

Roads / Highways

$200,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
879
Active Projects
432
Bidding Soon
5,997
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2029

Project location map

Multiple Locations, Sudbury, MA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed