BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2024 at 8:00 PM

Updated January 4, 2025

Site work and paving for a mixed-use development in Kirkwood, Missouri. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

The proposed scope of work includes along East Essex Avenue from Dickson Street to North Sappington Road consisting of installing new roadway resurfacing pavement and texturing, concrete sidewalk including ADA compliant curb ramps, new concrete curb and gutter, driveway approach replacement, inlet/manhole adjustments, modular block retaining walls, sodding, pavement markings and other appurtenances. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the current version of the Missouri Standard Specifications for Highway Construction including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. A certified cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The City of Glendale reserves the right to reject any or all bids. The project will be awarded to the lowest, responsive, responsible bidder. The DBE Goal for this project is 10%. No 2nd tier subcontracting will be allowed on this project MODOT - East Essex Avenue Roadway and Sidewalk Improvements

Award

Roads / Highways

$1,078,044.00

Public - City

Paving, Site Work

98

8

6

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
116
Bidding Soon
1,274
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2024

August 26, 2024

Project location map

E Essex Ave, Kirkwood, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.