Published November 22, 2025 at 7:00 PM

Updated November 23, 2025

Site work, paving and outdoor lighting for a mixed-use development in Monroe, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

1690-04-62 WISC 2026028 Monroe - New Glarus; Bushnell Creek to Cow Path Lane, STH 069 Green County 1690-04-73 WISC 2026029 Monroe - New Glarus; Wittenwyler Rd&CTH C Intersections, STH 069 Green County Work Summary: Removals, Milling, Grading, Aggregate, Concrete Pavement, Asphalt Pavement, Structure Rehabilitation, Culvert Pipe, Curb and Gutter, Concrete Sidewalk, Storm Sewer, Beam Guard, Erosion Control, Permanent Signing, Traffic Control, Pavement Marking, Lighting, Restoration. Work Type: A DBE Goal: 0% Completion Date Contract: November 01, 2026 Guaranty Required: $100,000.00 Estimate Anticipated Funding $6,000,000 - $6,999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, banks check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Unless otherwise specified in this advertisement, the Department will issue bidding proposals only to those who have established their qualifications for the work to be bid upon. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than TEN business days prior to the time set for submitting bidding proposals on a form furnished by the Department. The Department will evaluate this statement and will issue bidding proposals as it deems warranted. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than TEN business days prior to the time set for submitting bidding proposals on a form furnished by the Department Question Deadline 11/10/2025 at 11:45 AM CT Questions will be allowed up to 11:45 a.m. the day before the letting, however any question submitted after 2 p.m. the Thursday prior to the letting may not have sufficient time to prepare a thorough response or develop a contract addenda. WI DOT - 001 - Monroe - New Glarus (STH 069) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Culvert Pipes New culvert pipes shall be fully backfilled by the end of the day in which the removal begins. After placing the culvert pipe, the contractor may place a temporary base aggregate surface that is flush with the existing pavement. The excavation shall be paved within 48 hours of placement of the culvert pipe. Excavation of the temporary base aggregate surface for HMA Pavement paving shall be incidental to the culvert pipe bid items. Curb Ramp Historic marker curb ramp shall only be constructed during Stage 3. Milling and Paving Operations Place the layer of HMA pavement withing 72 hours of any milling or prior to a holiday or weekend. Pave areas of Removing Distressed Pavement Milling the same day the extra depth milling occurs.

Award

Roads / Highways

$7,781,725.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

737

9

2

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
90
Bidding Soon
1,538
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2025

January 12, 2026

Project location map

WI-69, Monroe, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.