BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Elk City, Idaho. Completed plans call for site work for a development.

Scope of Contract:. This contract involves decommissioning of the Allison and Eriksondam complexes and restoration of the drainage to a native wetland habitat. The project willbe broken into two projects (Base and Option). Depending on USFS funding available,both options may be awarded simultaneously. The Base option includes decommissioningof the two primary dams (Allison 1 and Erikson 1) and restoration in the immediate areas.The Option includes decommissioning the remainder of the dams/impoundments in thearea, and restoration of the associated areas. Project Location: Allison Pond 1 is located about 15 miles West of Elk City, ID. ALLISON POND 1: 45.835914 N 115.590011 W Head north on USFS Dr toward American River Rd 197 ft Turn left onto American River Rd 0.3 mi Turn right onto Main St/Mother Lode Rd / Continue to follow Main St 0.5 mi Continue onto ID-14 W 12.0 mi Turn right onto National Forest Development Rd 1858/Newsome Bridge Rd/NewsomeCreek Rd 0.3 mi. Turn right onto Old Elk City Wagon Rd Ericson Pond 1 is located about 7 miles North of Elk City, ID. ERICSON POND 1: 45.903515 N 115.479171 W Head southwest on American River Rd toward Main St/Mother Lode Rd Turn right onto Main St/Mother Lode Rd Continue to follow Main St 0.2 mi Turn right onto Old Elk City Wagon Rd/Sweeney Hl Rd 0.1 mi Turn right onto Rd 1854/Elk Creek Rd 3.2 mi Turn left onto American River Rd/Erickson Ridge Rd/Falls Point Rd 0.9 mi Turn left onto American River Rd/Falls Point Rd/Table Meadows Rd Preproposal Site Visit. There will be an optional pre-bid tour on Wednesday, August 28,2024,at 10 PDT / 11 MDT at Red River Ranger District in Elk City, ID. Please contact Zac Hiedeman, zachary.hiedemanusda.gov, if you will be attending the optionalprebid tour. Offerors are encouraged to visit the site on their own. Access questionscan be directed to the Red River Ranger District, 208-842-2245. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All offer submission questions can be directed to Daniel Franco (daniel.francousda.gov). All project specific, technical questions should be submitted to Zac Hiedeman (zachary.hiedemanusda.gov

Post-Bid

Conservation and Development

$1,000,000.00

Public - Federal

Site Work

35

13

4

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
3
Bidding Soon
67
All Active Projects
36
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2024

May 1, 2025

img_map_placeholder

Allison creek, Elk City, ID


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.